Browse
Search
RES-2005-043 Comments Draft 2006-2012 State Transp Imp Prog Division 7 Projects in Orange Co
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2000-2009
>
2005
>
RES-2005-043 Comments Draft 2006-2012 State Transp Imp Prog Division 7 Projects in Orange Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2011 12:28:54 PM
Creation date
10/18/2010 12:26:36 PM
Metadata
Fields
Template:
BOCC
Date
5/15/2005
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6c
Document Relationships
Agenda - 05-17-2005-6c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 05-17-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />part of the Triangle Greenprint project. Reservation of a pedestrian crossing <br />linking these two large open space and trail areas would be desirable. <br />2. Design Features <br />Planning and design for this project are in progress. Right-of-way acquisition <br />is scheduled to start in FFY 10 - FFY 12, with construction. starting in FFY 10. <br />Orange County requests that NCDOT consider the following design features <br />for this project: <br />a. Provide HOV lanes. Orange County is opposed to any widening of I-85 <br />through Orange County unless there is a commitment by NCDOT to <br />provide HOV and/or dedicated bus lanes. <br />b. Use native plants in landscaping at interchanges for this project. <br />c. Include noise walls or other means to reduce the effects of traffic noise on <br />residential and other uses located along the corridor. <br />d. Include anv available wildlife mitigation measures, particularly at bridges. <br />e. Incorporate bridge designs that allow wildlife to cross safely under the <br />bridge and that allow pedestrian passage along anv existing or planned <br />trail-system connectors. <br />3. Infrastructure Improvements <br />Orange County requests the following infrastructure improvements as they <br />relate to the I-85/US 70 Economic Development District. <br />a. Erosion Control Measures -Orange County requests that permanent <br />erosion control measures be included in the project. <br />b. Landscaping of Interchanges -Orange County requests that NCDOT <br />landscape all reconstructed interchanges in an aesthetic manner. <br />c. Pedestrian and Bicycle Facilities -Orange County requests that its staff be <br />allowed to participate in the determination of where and what type of <br />facilities are to be included in this project. Among the features requested <br />for inclusion are sidewalks and bike lanes (see the Regional Bicycle Plan <br />for Durham and Orange Counties) along roads where interchange <br />improvements are required and adequate guardrails on overpasses. <br />d. Wildlife Corridor Under I-85 (in the vicinity of US70 Interchange) -Orange <br />County requests that its staff be allowed to participate during the planning <br />stage and that this issue be brought to the attention of the NCDOT Staff <br />Biologist. Constructing this wildlife corridor is one of the recommendations <br />presented in the "The New Hope Corridor Open Space Master Plan: <br />Proposals for Linking Duke Forest and Eno River State Park." Orange <br />
The URL can be used to link to this page
Your browser does not support the video tag.