Browse
Search
Agenda - 10-19-2010 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 10-19-2010 - Regular Mtg.
>
Agenda - 10-19-2010 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 10:46:40 AM
Creation date
10/15/2010 11:06:22 AM
Metadata
Fields
Template:
BOCC
Date
10/19/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-19-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> NC 54 / 1-40 CORRIDOR STUDY <br /> EXECUTIVE SUMMARY 17 <br /> Description Location Jurisdiction Phase Cost <br /> for transition. <br /> Short Term <br /> As specified in the adopted (2012_ <br /> Construct collector street system Southwest Durham--Southeast Durham $31,400 1000 <br /> including turn lanes on NC 54. e! Hill Collector Street Plan 2017 and <br /> Chapel beyond) <br /> Construct access road behind the Short Term <br /> Farrington Road shopping center Between Farrington Rd and Durham (2012- $4401000 <br /> for connection between Farrington Falconbridge Rd 2017) <br /> Road and Falconbridge Road. <br /> Obtain Marriot Way,then upgrade Short Term <br /> Between Friday Center Dr and E Chapel Hill 2012- $$00,000 <br /> to NCDOT standards and extend to Barbee Chapel Rd p 4 <br /> Barbee Chapel Road. p 2017) <br /> Construct other connections as Durham & Short to <br /> opportunities arise through Through study area Variable cast <br /> Chapel Hill Long Term <br /> development proposals. <br /> Improve 1-40 interchange to add <br /> new partial cloverleaf ramp for I- Mid-Term <br /> 40 EB to NC54 EB,remove existing <br /> 1-40 Interchange with NC 54 Durham (2017- $1,1 OO,gOq <br /> signal and install yield sign at the 1- 2022) <br /> 40 EB to NC54 WB ramp with <br /> addition of merge lane. <br /> Construct EB NC 54 to EB I-40 Mid-Term <br /> flyover from Farrington Road to 1- 1-40 Interchange with NC 54 Durham (2017- $10,800,000 <br /> 40 EB on-ramp. 2022) <br /> Construct auxiliary lane widening Mid-Term <br /> for 1-40 westbound off ramp to <br /> 1-40 Interchange with NC 54 Durham (201 7- $1,1 00,000 <br /> match the two lane section of the 2022) <br /> ramp. <br /> AUGUST 2010 -- DRAFT FILIAL REPORT 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.