Browse
Search
Agenda - 10-19-2010 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 10-19-2010 - Regular Mtg.
>
Agenda - 10-19-2010 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 10:46:40 AM
Creation date
10/15/2010 11:06:22 AM
Metadata
Fields
Template:
BOCC
Date
10/19/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-19-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 NC 54 11-40 CORRIDOR STUDY EXECUTIVE SUMMARY <br /> PEDESTRIAN AND BICYCLE <br /> Description Location Jurisdiction Phase Cost <br /> During construction of superstreet Farrington Rd&NC 54 Durham Mid-Term <br /> modifications,implement crosswalks (2017- <br /> and landscaped medians on the 2022) <br /> northern,southern and eastern <br /> approaches,and provide adequate <br /> signage for pedestrians to cross to <br /> south side to travel over 1-40 bridge. <br /> Design and construct light rail bridge Across NC 54 connecting Chapel Hill "Long Term TBD <br /> over NC 54 to serve as an elevated Meadowmont and Friday Center (2022- <br />; pedestrian crossing. 2035) <br /> Continue to make regional connections where possible Durham& Long Term Variable cost <br /> with greenways. Chapel Hill (2022- <br /> 2035) <br /> Description Location Jurisdiction Phase Cost <br /> Construct channelized free flow Along C 54 at E Barbee Chapel Short Term <br /> lane for eastbound right turns into g p Rd Chapel Hill (2012- $700,000 <br /> East Barbee Chapel Road 2017 <br /> Construct northbound right turn Short Term <br /> channelization to free flow merge Friday Center Dr Chapel Hill (2012- $900"000 <br /> lane onto eastbound NC 54 2017) <br /> Construct Farrington Road slip ramp Short Term <br /> for northbound traffic on Farrington Farrington Rd Durham (2012- $3,300,004 <br /> Road to access eastbound 1-40 2017) <br /> directly.Modify on-ramp to allow <br /> AUGUST 201 0 -- DRAFT FINAL REPORT 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.