Orange County NC Website
16 NC 54 11-40 CORRIDOR STUDY EXECUTIVE SUMMARY <br /> PEDESTRIAN AND BICYCLE <br /> Description Location Jurisdiction Phase Cost <br /> During construction of superstreet Farrington Rd&NC 54 Durham Mid-Term <br /> modifications,implement crosswalks (2017- <br /> and landscaped medians on the 2022) <br /> northern,southern and eastern <br /> approaches,and provide adequate <br /> signage for pedestrians to cross to <br /> south side to travel over 1-40 bridge. <br /> Design and construct light rail bridge Across NC 54 connecting Chapel Hill "Long Term TBD <br /> over NC 54 to serve as an elevated Meadowmont and Friday Center (2022- <br />; pedestrian crossing. 2035) <br /> Continue to make regional connections where possible Durham& Long Term Variable cost <br /> with greenways. Chapel Hill (2022- <br /> 2035) <br /> Description Location Jurisdiction Phase Cost <br /> Construct channelized free flow Along C 54 at E Barbee Chapel Short Term <br /> lane for eastbound right turns into g p Rd Chapel Hill (2012- $700,000 <br /> East Barbee Chapel Road 2017 <br /> Construct northbound right turn Short Term <br /> channelization to free flow merge Friday Center Dr Chapel Hill (2012- $900"000 <br /> lane onto eastbound NC 54 2017) <br /> Construct Farrington Road slip ramp Short Term <br /> for northbound traffic on Farrington Farrington Rd Durham (2012- $3,300,004 <br /> Road to access eastbound 1-40 2017) <br /> directly.Modify on-ramp to allow <br /> AUGUST 201 0 -- DRAFT FINAL REPORT 13 <br />