Orange County NC Website
i <br /> NC 54 / 1-40 CORRIDOR STUDY <br /> EXECUTIVE SUMMARY 15 <br /> PEDESTRIAN <br /> Description Location Jurisdiction Phase Cost <br /> property from Hamilton Rd at (2017- under the item <br /> Brandon Rd to connect to S Estes 2022) "Widen NC 54 <br /> Dr utilizing existing trail and to six lanes in <br /> along the NC 54 frontage to the Durham <br /> connect to the existing multi-use section. <br /> path at Burning Tree Dr Construct the <br /> multi-use path <br /> concurrent with <br /> off-road hared-use path NC 54 from Farrington Rd to 1-40 Durham Mid-Term the road <br /> Construct an o oad s p g project." <br /> on the south side of NC 54 with overpass (2017- <br /> accompanying signage to cross. Path 2022) <br /> should have minimum 10-foot width; <br /> ideally 15 feet if possible. <br /> Construct sidewalk on south side of NC South side of NC 54 from Durham Mid-Term <br /> 54 to connect to 1-40 overpass. Huntingridge Rd east to 1-40 (2017- <br /> overpass 2022) <br /> Construct a 10-foot wide shared use NC 54 bridge over 1.40 Durham Mid-Term <br /> path on south side of overpass. (2017- <br /> 2022) <br /> Implement crosswalks and landscaped Meadowmont Ln/Friday Center Chapel Hill Mid-Term The cost for <br /> median refuges at primary superstreet Dr&NC 54 (2017- these <br /> intersections. 2022) improvements is <br /> included in the <br /> roadway <br /> Huntin rid a Rd &NC 54 Durham Mid-Term projects list <br /> g g <br /> (2017- <br /> under the item <br /> 2022) "Construct EB <br /> NC 54 to EB I- <br /> 40 flyover from <br /> Farrington <br /> Adequately sign reverse superstreet E Barbee Chapel Rd & NC 54 Chapel Hill Mid-Term Road to I-40 EB <br /> intersections. (2017- on-ramp." <br /> 2022) <br /> Falconbridge Rd &NC 54 Durham Mid-Term <br /> (2017- <br /> 2022) <br /> AUGUST 2010— DRAFT FINAL REPORT 12 <br />