Browse
Search
Agenda - 10-19-2010 - 4e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 10-19-2010 - Regular Mtg.
>
Agenda - 10-19-2010 - 4e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 3:46:40 PM
Creation date
10/15/2010 10:49:30 AM
Metadata
Fields
Template:
BOCC
Date
10/19/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4e
Document Relationships
Minutes 10-19-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Hillsborough Stormwater Management Program <br /> Work Plan September 2010 <br /> 5. Post-Construction Stormwater Management <br /> BMP Measurable Goal Responsible Party <br /> New Development Review proposed new development projects to ensure compliance with the Town's SRO <br /> Review stormwater post-construction requirements <br /> Inspect new structural stormwater BMPs at the time the project is complete to ensure SRO, OCED <br /> compliance with approved plans <br /> Map new BMPs using GPS/GIS technology SRO, OCED <br /> BMP Inspections Review required annual inspection reports submitted by the BMP the owner SRO <br /> Conduct follow-up inspections as warranted and provide inspection reports to owner SRO, OCED <br /> outlining follow up actions <br /> Issue notice of violations if warranted SRO, Hillsborough <br /> Education/Outreach This portion of the post-construction stormwater management program is part of the SRO, OCED <br /> overall education/outreach component described in items 1 and 2 above <br /> Identify at least one new possible stormwater retro-fit location annually SRO <br /> Evaluate sites already identified based on land availability, willing ownership, potential SRO <br /> for pollution reductions, and other pertinent variables <br /> Retro-fit Opportunities Rank these sites and evaluate grant availability and/or other funding sources to <br /> implement retro-fits SRO <br /> Provide this information to the state and identify potential partnerships to develop and SRO <br /> fund retro-fit projects <br /> Through an inter-local agreement, the Orange County Erosion Control Division <br /> reviews and approves stormwater management plans for new development. An <br /> electronic database is maintained on each permitted site including inspection reports. <br /> Evaluation Information regarding number of plans reviewed, BMP inspections and other pertinent OCED <br /> information is tracked and will be included in the annual report to the state for <br /> development within the Town's jurisdiction. Orange County also provides this <br /> information to NCDWQ pursuant to their Neuse stormwater program. <br /> N <br /> ch <br /> Page 23 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.