Browse
Search
2005 S Purchasing - Solid Waste Administration Building Architect
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Purchasing - Solid Waste Administration Building Architect
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2013 4:38:35 PM
Creation date
10/13/2010 8:40:37 AM
Metadata
Fields
Template:
BOCC
Date
4/19/2005
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9d
Document Relationships
Agenda - 04-19-2005-9d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 04-19-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 11 BASIS OF COMPENSATION <br />The Owner shall compensate the Architect as follows: <br />§ 11.1 An Initial Payment of n f a <br />( n/a } skull be made upon execution of this Agreement and credited to the Owner 's account at final <br />payment. <br />§ 11.2 BASIC COMPENSATION <br />11.2.1 For Basic Services, as described in Article 2, and any other services included in Article 12 as part of Basic <br />Services, Basic Compensation shall be computed as follows: <br />(Insert basis of compensation, including stipulated sums,, multiples or percentages, and identify phases to which <br />particular methods of compensation apply, if necessary.) <br />Stipulated sum of $89,800 <br />11.2.2 Where compensation.is based on a stipulated stun or percentage of Construction Cost, progress payments for <br />Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: <br />(Insert additional phases as appropriate.) <br />Schematic Design: percent( 15 %) $13,470 <br />Design Development Phase: percent;( 20 %) 17,960 <br />Construction Documents Phase: percent( 35 %) 31, 430 <br />Bidding;or Negotiation Phase: percent ( 5 %) 49490 <br />Construction Phase: percent'( 25 %) 22,450 <br />Total Basic Compensation one hundred percent ( 100.00 %) $89,800 <br />§ 14.3 COMPENSATION FOR ADDITIONAL SERVICES <br />§ 11.3.1 For Project Representation Beyond Basic Services, as described in Section 3.2, compensation shall be computed <br />as follows: <br />n/a <br />AIA Document B151 TM —1997. Copyright* 1974, 1978, 1987, and 1997 by The American Institute of Architects. All rights reserved. WARNING: This <br />AlODocument is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction' or distribution of this Ale Document, �� <br />or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. <br />Purchasers are permitted to reproduce ten {10} copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail <br />The American institute of Architects' legal counsel, copyright@aia.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.