Browse
Search
Minutes 08-23-2010
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2010
>
Minutes 08-23-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 2:43:38 PM
Creation date
10/6/2010 2:43:14 PM
Metadata
Fields
Template:
BOCC
Date
8/23/2010
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 08-23-2010 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 08-23-2010 - Work Session
Agenda - 08-23-2010 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 08-23-2010 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o consistent with the MPD-CZ Master Plan parameters approved by the <br /> BOCC <br /> - MPD-CZ rezoning approval can specify project review and construction time <br /> frames for approval for each development area <br /> - Ideal for business and industrial parks <br /> - Master infrastructure developer possible with later sales of individual lots <br /> Signage (Section 6.12) <br /> - A re-work of existing regulations <br /> - Rectify existing issues and conditions within the County <br /> - Many new signage definitions added to Article 10 <br /> - Incorporates some existing standards <br /> o (i.e. comprehensive sign standards for parks & recreation facilities) <br /> - Incorporates the sign regulations and standards from EDD Design Manual <br /> o More work to be done on this section with the business community as <br /> part of an economic development effort <br /> Landscaping, Buffers, and Tree Protection (Section 6.8) <br /> - Explains what and how many should be planted <br /> o Native/ Drought Tolerant <br /> - Permits some flexibility in timing and placement of plant materials <br /> - Establishes maintenance requirements to ensure continued viability of plant <br /> materials <br /> - Includes screening requirements for on-site activities (outdoor storage, refuse <br /> containers, loading facilities, etc.) <br /> - Incorporates additional landscaping and buffering requirements from EDD <br /> Design Manual <br /> o More review in progress <br /> Parking, Loading, and Site Access (Section 6.9) <br /> - Will rename "Parking, Loading & Circulation" in next draft <br /> - Re-work of existing regulations <br /> - New regulations include: <br /> o Criteria for renovations and adaptive re-use projects' compliance with <br /> parking requirements <br /> o Specific design standards for on-site parking and loading areas <br /> o Allowance for shared parking and reduction in required on-site parking if <br /> uses have varying peak hours of use <br /> - Incorporates parking and loading standards from EDD Design Manual <br /> o Review in progress to determine overlaps and/or inconsistencies <br /> Stream Buffers (Section 6.13) <br /> - Additional uses added to the lists of uses permitted within Stream Buffers <br /> o Consistent with State regulations <br /> - New category of `uses permitted with mitigation' <br /> Stream Buffers (continued) <br /> Uses Proposed to be Added <br /> - Archaeological activities <br /> - Dam/reservoir maintenance activities <br />
The URL can be used to link to this page
Your browser does not support the video tag.