Orange County NC Website
(100( 5 '2.xecui,:Ive Surm-nary writinued) <br />SCHOOL ADEQUtATE PUBLIC FACTLITIES ORDINANCE STATUS <br />(l aced on future year SLu,_Iellt M ei-nbtrship Projections) <br />Th fblTowillg nifonnation relates to existir2 school oerti.ficd capacities and is not related to new <br />It zis la'gon front DPI (Department of Public Instruction) a5ccting elementary schools. <br />cIL-IpEL jjjLL1C,,jB_RB0R0 SCHOOL DISTRXT <br />Fllementaz School District <br />A. Docs not currently exceed 105% LOS standards (current LOS is 95.40/0). <br />B. De,,-F,;,asc in the increase of the growth rate a, this level over the next 10 years. <br />C. Chapel F1 T I.,'Carrhoro Elementary Scl.-ook) I "10 should be scheduled for a 2009 -10 open-i n g <br />lfiddle Scheel, District <br />A. Does not currently exceed 107%, LOS standards (current LOS is 90. 1%). <br />B. Decrcasc, in the increase of the go%th rate at des level aver the next 10 years. <br />C. Chapel Hilb"Carrboro Middle School --'5 would 11.1,ely be projected for 201-3-1-4 versus the <br />prior year projection of.2009-1 0. <br />High School District <br />A, Curi-ent1v exceeds the 110% LOS standard (cum nt LOS is 112.8%), but IN'lemorandum o-f <br />(-'\40U) suspended the: Cer-Lificaie Adf; =qualc Public Schools (C-ARS) <br />ad,-quacy test at this level. so CAPS rnay still be issued. <br />13. Decrease in the hicrease of the growth rate at this tevel over the next 10 years_ <br />C. Chapt-1 ffilVCarrboro, Hiah School E' ) is still needed as soon as possible with current <br />Cunmft 11c'Llon schedule estimmes at 2006-2007 but, with a likely chwige to 200,17 -2008- <br />OR�4.'VG' C'O: t YTY SC1100L DISTRICT <br />Elementary School District <br />Dees not currently exceed 105% LOS standard (cuTTMI LOS is 19.0%). <br />B_ Increase IP the increase of the growth rate at this level over the next 10 yea s. <br />C. Does not affect or prompt CT activity in 10-, m, <br />Middle School District <br />A� Presently= at 108,7% LOS which eNceed S 107 % LOS standard but Memorandum of <br />Understanding (-N-40'U) suspended the C.-rdificzt-, Adequate Public Schools (CAPS) <br />adlcquacy test at this level until Orange County School District (OCSID)NIVieditt School <br />� - C. I <br />.,,� Gp,.�,js so C. � S may still be ;ssu d. <br />B. !,ncrtase in the increase of the gro•th rage �! this level over the next 10 years. <br />C. OCSD Nfiddle School #3 is still ne,edc-sd zs soon as possIble with coil struction scl�,-Ohlule <br />es i iniatt--!s at 2006-2007. <br />High School District <br />A� Does not currently exceed 1. 10% LOS: (currem LOS is 9 1 .7 %). <br />B. Necrease in the increase of the gpowth rate w -.1-is lewd over the next 10 years, <br />C. Docs not affect or prompt GIP amt_1"V'-_Zy -_rn 10-Year tire,- frame. <br />m <br />