Browse
Search
ORD-2005-010 - Schools Adequate Public Facilities Ordinance (SAPFO) - Approval of Annual Certifications
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2005
>
ORD-2005-010 - Schools Adequate Public Facilities Ordinance (SAPFO) - Approval of Annual Certifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:08:28 PM
Creation date
10/4/2010 4:56:52 PM
Metadata
Fields
Template:
BOCC
Date
3/1/2005
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Agenda - 03-01-2005-9a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 03-01-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sec,!�f-n f <br />B. Building Capacity <br />L Rexpansible- Entityfor Suggesdj��, Change -The Ptanning Directors, School <br />Rcgresentatives, Technical Advisor Cominnizftee (SAPF0TAQ will rec -ve r.- ui�_,ste <br />r, ei q, Ali <br />changes that are CIS related and adopted hi -thc- prior year. CIF' capacity changg s. wifl, be <br />LTD.- �a7e_d along wiLli actual rriember111110 T: celvecll In Noven-lb-tr of each yc,---. <br />Othe-, changes will be sent to a `Joix"Jz ActLion Committee' of the BOCC and Boo-rd of <br />Edncation, as noted in the MOU. %,vao, wili rn-a-k-c rocommendations and �brwzird chain -Tes <br />(4 --in The specific forins with justification) to Che fiUR Board of County Comjnissioni�rs for <br />re%�iew and action. These non-C2 clan -g-1-3 vxuld be updated in the upcorrung No tuber <br />CAPS sys�,cn recalibration aridi,C!Lided in the SAPFOTAC report. <br />2. Di-y7thition- "For purposes of&us NIc-mnorandum, "building capacity" wi .1 b d <br />by ref6rence to State gnfideliMes and the School District guidelines (consisrcnm wizh, Cu? <br />School Constiuction Guidellne-s-!policits dcvcIc)-Lcd bythe School Di -strict and 0fe <br />0.f,countv Colymlissioners) ani will be detern-nined by ajoint action of the Sch�x-,T Boa <br />I - MI: <br />sand ih-- Orange County Bovril of Colun-.ussitiers. As used herein the le- nn "hull, nog <br />capacitN," refers to permanent buildings_ Nfab-Ile classrooms and other temporary Stuckvt <br />of ht coumtd in <br />detr.-T-rnining the school districts buillding capacity <br />Standardfor: <br />Chapel Hill. Carrbolro School District Orange iCounty School DksLriCt <br />Thl• on' ezr_rz a I ce -tLi fi ed capacity for each of i1he <br />�chac]s was certified by the respective <br />and. 171corliarated M the <br />s.t'- -z a.ion of the CAPS system (Chapel- Hi <br />C�7,bloro School District April 29, 2002 - <br />Bas,e ) (Sc-- Artachment. T. B. 2) <br />Cap2cit_v i E ti S wcxe made each year as <br />Theonigin al. ce fied capacity for eac_*,ivsji, <br />Mi I <br />I <br />schlools was certified by the rc-spective <br />s-iperintendent and incorporated in he <br />Ii-nit'on of ffie CAPS sy-stem (Orange <br />County- School District April 30, '20",12 - Base) <br />(Sec Atytachn-ient I. B. 1.) <br />Capacity changes ml re tirade each wear as <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.