Browse
Search
2005 NS Housing - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 NS Housing - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:40:44 AM
Creation date
10/4/2010 10:06:28 AM
Metadata
Fields
Template:
BOCC
Date
3/1/2005
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Bertha Hill <br />Address: 118 S. Graham St. <br />W^- <br />City: Chapel Hill <br />Phone Number: Contact Kim Lassiter, Orange Co. Department on Aging. at <br />245-2880 <br />Date: November 16, 2004 <br />Exterior: <br />1. Remove the gutter and awnings. <br />2. Remove the asbestos siding, window and door trim, fascia <br />soffitt and window sashes. This work must be done by a <br />State Certified Abatement Contractor. <br />3. Replace the windowsills with likesize lumber. <br />4. Replace window trim with likesize lumber. <br />5. Install 5/4 inch, composition board on the gable fascia and <br />3/4 inch pine on the front and rear fascia. <br />6. Prepare all remaining exterior surfaces for paint. <br />Caulk all seams. Paint the crawlspace access door, <br />front porch ceiling, awnings and exterior doors with <br />semigloss latex exterior paint. <br />7. Install vinyl siding and trim. Install aluminum coil stock <br />on the fascia, windows and door trim. Install vinyl soffitt <br />panels with a vented panel every four feet on the front and <br />rear sections of the house. <br />8. Remove all tree limbs from over the house. <br />9. Install aluminum, continuous gutter and downspouts. <br />Install plastic splash-blocks under each downspout. <br />Downspoutsto be not more or less than six inches <br />above the splashblocks. <br />10. Install two self-closing foundation vents and two <br />galvanized foundation wells on the front of the house, <br />three self-closing vents on the left~side of the house, <br />two self-closing vents on the rear of the house, and three <br />self-closing vents on the right side of the house. <br />11. Install a pressure treated handrail on the front porch. <br />6 <br />12. Install a pressure treated handrail on the rear entrance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.