Browse
Search
2005 NS Housing - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 NS Housing - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:40:44 AM
Creation date
10/4/2010 10:06:28 AM
Metadata
Fields
Template:
BOCC
Date
3/1/2005
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 4. <br />Name: Chandra Edwards <br />Address: 213 Barnes St. <br />City: Carrboro <br />Phone Number: 960-0090, 210-5824 <br />Date: December 6, 2004 <br />Exterior: <br />1. Install two foundation vents and galvanized foundation <br />wells on the front of the house, one foundation vent <br />and a galvanized foundation well on the left side of <br />the house,. one foundation vent on the rear of the <br />house and a second vent and a galvanized foundation <br />well on the rear of the house. <br />2. Install aluminum,-continuous gutter and downspouts. <br />Install plastic splash-blocks under each downspout. <br />The downspouts to be not more or less than six inches <br />from the splashblocks. <br />Roof: <br />1. Install a galvanized chimney cap. <br />Interior: <br />Living Room: <br />Install a vinyl over wood storm door. Door to have a <br />pneumatic closure, vinyl threshold and limited life- <br />time warranty. <br />Kitchen: <br />Install one double insulated, vinyl replacement window and <br />trim. Windows to have one openable sash, screen and <br />locks. <br />2. Install'/< inch lauan plywood on the floor. Prepare the <br />floor for vinyl. Caulk all seams at the baseboard. <br />3. Install vinyl floor covering and metal trim. Vinyl to cost <br />not less than $14/yd. <br />4. Install shoemold set in a bead of caulk. <br />5. Install factory made kitchen cabinets. Cabinets to have <br />hardwood fronts and a factory finish. Install approx. eleven I.f. <br />of base cabinets and approx. eighteen I.f. of wall cabinets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.