Browse
Search
2005 NS Housing - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 NS Housing - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:40:44 AM
Creation date
10/4/2010 10:06:28 AM
Metadata
Fields
Template:
BOCC
Date
3/1/2005
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br />Name: Joyce Wilson <br />Address: 105 Roberts St. <br />`"~~ City: Carrboro <br />Phone Number: 432-1520 <br />Date: November 16.-2004 <br />Exterior: <br />Replace six windowsills with like size lumber. <br />2. Replace the front and front porch fascia. <br />3. Remove the rear soffitt. <br />4. Pressure wash the aluminum siding with a solution <br />formulated for aluminum siding. <br />5. Prepare the front porch and carport columns, latticework <br />crawl space access doors aluminum siding and awnings <br />for paint. Caulk all seams. Paint the crawlspace access <br />doors, the exterior doors, the front porch columns, lattice <br />work, gable vents and the shutters with semi gloss latex <br />exterior paint. Paint the aluminum siding with flat latex paint. <br />6. Install aluminum coil stock on the fascia and all exposed <br />wood trim. <br />7. Install vented vinyl soffitt on the front and rear soffitt. <br />8. Install aluminum, continuous gutter and downspouts. <br />Install plastic splash-blocks under each downspout. <br />Downspouts to be not more or less than six inches from the <br />top of the splashblock. <br />9. Replace two wrought, iron supports in the carport. <br />Roof: <br />1, Remove the roof covering to the sheathing. Install 15 Ib. <br />felt, aluminum drip edge, new plumbing boots and twenty <br />year warrantied shingles. Install the porch shingles with a <br />four inch reveal <br />2. Replace approx. 384 sq. ft. of sheathing. <br />3. Install 2x4 barge rafters and1x6 fascia on the front porch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.