Orange County NC Website
CHAPEL HILL-CARRBORO CITY SCHOOLS Key QSCBs PAYG <br /> CAPITAL INVESTMENTS PLAN 2010-2015 <br /> PROJECT TITLE 2010-11 2011-12 2012-13 2013-14 2014-15 <br /> ADA Projects 50,000 75,000 75,000 100,000 <br /> Abatement Projects 10,000 <br /> Elementary Schools:Floor Tile Replacement <br /> Phillips:Remove Asbestos Floor Tile <br /> Athletic Facilities <br /> Phillips:Gym Bleachers/Wood Floor <br /> CHHS:Gym Bleachers-Wood Floor <br /> CHHS:Stadium/Soccer Field Lighting 160,000 <br /> ECHHS:Athletic Fields/Track <br /> Classroom/Building Improvements <br /> Carrboro Elementary Classroom Casework/Bathrooms 80,000 <br /> Estes Hills:Classroom Casework/Bathrooms 50,000 <br /> Ephesus:Old Wing Bathrooms/Classroom Casework 50,000 <br /> CHHS:Bathroom Fixtures and Hardware 150,000 50,000 <br /> Culbreth:Locker Room Bathrooms <br /> Philips:StaffLower Level Bathrooms/Auditorium Seating 75,000 <br /> Doors/Hardware/Canopies 35,000 <br /> Scroggs:Canopy at Mobile Units 40,000 <br /> Ephesus:Canopy at Kiss-n-Go <br /> Electrical Systems <br /> All Schools:Increase Electrical Distribution/Improvements 130,000 150,000 100,000 125,000 125,000 <br /> Energy Efficiency/Lighting Improvemnets <br /> CHHS:Lighting Upgrades/Efficiency <br /> Fire/Safety/Security Systems <br /> Lincoln Center:Fire System <br /> FPG:Intercom jg 4 <br /> Culbreth:Access Controls <br /> CHHS:Security Upgrades-C and D Buildings Video <br /> ECHHS:Intercom <br /> i <br /> Indoor Air Quality Improvements <br /> Classroom Carpet Removal:McDougle <br /> Classroom Carpet Removal:Camboro Elm. <br /> Classroom Carpet Removal:FPG,Seawell <br /> Mechanical Systems <br /> Estes Hills:Chiller for Multi Purpose Building <br /> Estes Hills:humidity controls 9 lower level classrooms <br /> Scroggs:Back-up Chiller/Cooling Tower <br /> CHHS:C/D Buildings Replace Electric Heat <br /> Mobile Classrooms/Rental Space 97,000 100,000 103,000 106,000 110,000 <br /> Paving:Parking Lots/Driveways/Walkways <br /> CHHS:North Parking Lot and Driveway <br /> Phillips:Staff Parking Lot <br /> Seawell:Staff Driveway and Parking Lot <br /> Roofing Projects <br /> McDougle Elm/Mdl:Replacement 2,371,000 <br /> Glenwood:Primary Building 400,000 <br /> Ephesus Elm:1991 Building Addition <br /> Phillips:1990 Media Center Wing/Auditorium <br /> CHHS:B Building-kitchen,mechanical area <br /> CHHS:Vocational Ed Building <br /> Window Replacements <br /> CHHS:Window Replacements <br /> Technology 1,499,548 2,041,097 2,068,143 2,099,180 2,134,440 <br /> QSCB Payment <br /> TOTAL EXPENDITURES-10 YEAR CIP 6,604,274 4,050,097 3,966,143 3,745,180 4,009,440 <br /> Summary of Expenditures: <br /> Long Range Pay-As-You-Go Funds-Projects 1,596,548 t2,696,097 2,746,143 2,405,180 2,469,440 <br /> ry Balance-Projects 1,698,363 <br /> QSCB-2010 Application-Projects 2,371,000 <br /> Total CIP Expenditures 6,604,274 4,050,097 3,966,143 3,745,180 4,009,440 <br /> 2010-15 CIP FUNDING at Pre-Reduction Levels 2010-11 2011-12 2012-13 2013-14 2014-15 <br /> CIP FUNDING SOURCES: <br /> Long Range Pay-As-You-Go Funds-at Pre-Reduction Levels 1,596,548 2,704,680 2,758,773 2,820,846 2,891,367 <br /> Lottery Balance 1,700,000 <br /> QSCB-2010 Application 2,371,000 <br /> TOTAL CIP FUNDING 6,605,911 4,082,193 4,136,286 4,198,359 4,268,880 <br /> To Be Assigned 1,637 32,096 1 170,143 453,179 1 259,440 <br /> FUNDING CONTINUES AT DECREASED LEVELS: <br /> 2010.15 CIP FUNDING 2010-11 2011-12 2012-13 2013-14 2014-15 <br /> CIP FUNDING SOURCES: <br /> Long Range Pay-As-You-Go Funds 1,596,548 1,620,496 1,652,906 1,690,097 1,732,349 <br /> REMW <br /> Lottery Balance 1,700,000 <br /> QSCB-2010 Application 2,371,000 <br /> TOTAL CIP FUNDING 6,605,911 2,558,859 2,591,269 2,628,460 2,670,712 <br /> To Be Assigned 1,637 1 (1,491,238) (1,374,874) (1,116,720) (1,338,728) <br />