Orange County NC Website
Orange County Middle School #3 <br />Construction Cost Comparison to School Construction Standards <br />Middle School #3 Capacity = 700 students <br />Square Footage: 122,763 <br /> <br /> <br />._-_ -- ------ -------------i <br />. -__ .-_ _ . _______-_ ~ <br />. <br />~ <br /> <br />-------- ------------- -~ <br />1996 School <br />-------_.___ ----- <br />Construction <br />Standards (SCS) <br />Present Value <br /> <br />School Constr <br />Standards __.. _-- <br />- CI2Z 9/3/2003 <br /> <br />Construction ~ <br />Estimate <br />C12Z 9/7/2004 <br /> <br />Construction <br />Estmate <br />Construction Bids <br /> <br />12/07/2004 <br />____ _ _ <br />---- ------- - - - -- _ _ _ _ <br />L - _ L .---- <br />- __ <br /> <br />Construction <br />________- <br />Cost Per S uare Foot I <br />~____q ___ _ --- -- ._ _. <br />- <br />__-$95.00 .. - -- <br /> <br />-___$128_25 <br /> <br />_ <br />-..__-..__$1 <br />12_17 <br /> <br />$132.49 <br /> <br />$132.45 <br />------------------- <br />_. .-_. <br />Site Development ---------------- ---------__, <br />. ------.-------- ----------- ------- <br />as % of Construction Cost ----- ------ <br />-- <br />10.00% <br /> <br />10.00% - <br />, <br />_ <br />12.00% <br /> <br />15.00% $16,259959 <br />see note #1 below <br />15..3% <br />(includes all site _ (see note #2 below) _ __ <br />_ <br />work, examples of which include: roads, including any required off site road improvemenfs, -__ <br />_ <br />parking lots, on-site water and sewer and all grading.) _ _ _ <br />__ ___ <br />_ <br />______ ___ <br />Bids received on 12/7/04 totalled $18,273,846. However, they also include all sife d evelopment costs that were not incl uded <br />_____ _ -_ <br />___ <br />___in fhe earliersitework bids received in the Fall 2004. The $16,259,959 consfruction cost, listed above, is the architect's <br />____ estimafe of fhe amount thaf should be allocated fo actual building consfruction. -__ <br /> _____ _______ ____-_ <br />(2) Total site development costs incuding early grading package) total $2,723,132 or 16.7% of the construction cost. _ ___ ___ ____ <br />The architect's preliminary estimafe of the soccer center's portion of fhe cost for shared facilifies is $237,525, which would <br />reduce the dev e~enf costs to a~oximately 15.3% of the construction budget_ _________ __ ___ _- <br /> <br /> <br /> <br /> <br /> <br /> <br />