Browse
Search
ORD-2005-006 - Middle School #3 Orange County Schools Capital Project Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2005
>
ORD-2005-006 - Middle School #3 Orange County Schools Capital Project Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2011 10:42:48 AM
Creation date
9/29/2010 4:29:02 PM
Metadata
Fields
Template:
BOCC
Date
1/24/2005
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6a
Document Relationships
Agenda - 01-24-2005-6a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 01-24-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I -a ~-~-vvs <br />~-- <br />Chair Carey said that there is also an Orange County Disability Awareness Council that. <br />the County supports. <br />Commissioner Halkotis asked that all leased properties be included. in the handicapped <br />accessib ity component. <br />A motion was,made by Commissioner Gordon, seconded by Commissioner Foushee to <br />accept the final Report on Functions and Responsibilities of the Human Rights and Relations <br />Department and amend the County's.Classification and Pay Plan to addthe new class of LEP <br />(Limited English Proficiency) Coordinator at salary grade 17 effective February 4, 2005. <br />DOTE: UNANIMOUS <br />6. Resolutions or Proclamation <br />a. Middle School #3 Capital Protect Ordinance <br />The Board considered a .resolution and a revised capital project ordinance regarding <br />appropriation of additional funds-:for construction of Orange County. Schools (OCS) Middle <br />School #3. <br />John Link said that in November 2001, the voters of Orange County approved.. in the <br />school bond-$18.5 million for constructing a new middle school for the fJrange County school <br />system.. This `$18.5 million, at that point, was the amount that had been specified in the <br />construction standards adopted several years ago. Since that time, a site has been located,. <br />approximately 1.00 acres: between West- Ten Road and I-40/1-85. The school system and the <br />County Commissioners and staff have been working on developing the-total area so that, as the <br />school is planned and built, there will also be work on multiple soccer fields in the same area. <br />The school system and the County Commissioners have entered into an inter-local agreement. <br />He said that this item is related to the outcorne of the bids that-were received in December by <br />the school board. Thee. action is to ask the Board to consider appropriating as much as $3.5 <br />million in additional funds toward this project, based on the costs of steel, concrete, etc. There. <br />is also a letter from Superintendent Carraway (peach colored) indicating that the school system <br />has identified $350,000 of their revenue to address this shortfall. -This is in response to a letter <br />sent by him to both superintendents in September asking them to identify sources of revenue to <br />help in the overruns _of Phis project and. High School #3 in the Chapel Hill-Carrboro City school <br />system.. <br />Rod Visser said that this is-an urgent issue because the middle school is slated to-.open <br />in August 2006:: The project architects have indicated to the schoo board that in order to keep <br />this.. project on track, it is important to begin construction bymid-February. The: school board <br />has this item on its agenda tonight. In :December, the Board indicated that it intended to <br />reallocate some or perhaps all of the $12.8 million that is-currently earmarked in the County's <br />plan for CHCCS Elementary#10 to address some of the anticipated cost overruns for this <br />project and the CHCCS High School #3 project and perhaps the senior centers: Funds to build <br />Elementary school #10 will be allocated at a later date. This. action is to specifically fol ow upon <br />this indication of intent in December. <br />Rod Visser pointed out thatin October the Board asked that a work group: be put <br />together, comprised: of County and' chool representatives; that coald examine ongoing issues <br />related to the joint relationship between the middle school project and the adjacent County <br />soccer complex. Chair Carey is serving on this work group along with other staff members...,. <br />Chair Libby Hough, Superintendent Carraway, and other school toff members. The .,group mete. <br />last week to talk about budgetary considerations. There is some work to be done on .;potential <br />additional joint savings through economies of scale. Also, County`staff conducted an <br />assessment of the cost overruns for this project and for High School #3, and it is summarized in <br />the abstract: . <br />
The URL can be used to link to this page
Your browser does not support the video tag.