Orange County NC Website
Orange County Middle School #3 <br />Construction Cost Comparison to School Construction Standards <br />Middle School #3 <br />Capacity = 700 students <br />Square Footage: 122,763 <br />- - - - -- <br />- - <br />1996 School <br />Construction <br />Standards (SCS) <br />i $95.00 <br />-- - - - -- - -- -- — - <br />Present Value <br />i School Constr. <br />Standards <br />-- -- <br />$128.25 <br />- - - - -- <br />CRZ 9/3/2003 <br />Construction <br />Estimate <br />-. _ - - - -- -- - - -- _ --- <br />$112.17 <br />12.00 %� <br />CRZ 9/7/2004 <br />Construction Bids <br />12/07/2004 <br />$132.45 <br />$16,259,959 <br />note #1 bellow) <br />15..3% <br />(see <br />see note #2 below <br />Construction <br />Esimate <br />- - - - -- - - - <br />$132.49 <br />I <br />Construction <br />Cost Per Square Foot <br />- - - -- - <br />- - - - - - - -- - -- <br />as % of Construction Cost <br />- -- <br />L -- - - - - -- - -� <br />- -- - - <br />10.00% <br />Site Development <br />(includes all site <br />- - - <br />10.0.0% <br />-- -- <br />15.00% <br />- -- -- <br />work, examples of which include roads, including any <br />-- -� <br />required off site road <br />-- - -- - - <br />improvements, <br />-- - <br />- -- - -- <br />development costs <br />- -- lo) - -- <br />- - - - <br />parking lots, on -site water and sewer and all grading.) <br />----------- - - - - -- - - -- - -- - - - - -- - - - - -- <br />(Bids received on 1217104 totalled $18,273,846. However, they also include all site <br />that were not included <br />_ in the earlier sitework bids received in the Fall 2004. The $16,259,959 construction cost, listed above, is the architect's <br />estimate of the amount that should be allocated to actual building construction. <br />-- - - - -- - - - - - -------- � - - -- — - -- - - - -- -- <br />-- <br />(2) Total site development costs ( incuding early grading package) tofa/ $2, 723,132 or 16.7% of the construction cost. <br />------ - - - - -- <br />-The architect's preliminary estimate of the soccer center's portion of the cost for shared facilities is $237,525, which would <br />reduce the development <br />costs to approximately <br />---------- <br />-- <br />15.3% of the <br />- -- - - -- - -- <br />construction budget <br />i <br />- - - -- - - - - - -- <br />i <br />