2 <br />received in December 2004 for the construction of the middle school. The group agreed that it <br />would address other outstanding issues in future meetings. The central consideration at <br />present is that in order for the middle school to open as planned in August 2006, construction <br />work must begin by mid - February 2005. <br />Directly related to that project timetable is the need for the Orange County Board of Education <br />to award construction bids and enter into appropriate contracts for the construction work. The <br />Board of Education's agenda for their meeting on January 24 includes action on those items. <br />The middle school project architects have noted since project inception that the $18.5 million in <br />bond funding would likely be inadequate to cover the costs of constructing a middle school <br />similar in size and scope to Smith, the most recently opened middle school in Orange County. <br />OCS Middle School #3 has been designed largely as a prototype of Smith (with some <br />differences) and is currently programmed at about 123,000 square feet, which is within the <br />parameters established in the BOCC's middle school construction standards. The design is <br />intended to incorporate a variety of aspects related to greenbuilding and smart growth <br />initiatives. <br />In Fall 2004, the project architect explained to the Board of Education that substantial increases <br />in the market rates for steel, concrete, fuel, and other construction related commodities would <br />likely be reflected in the construction bids. This prompted the Board of Education to request <br />that the Board of Commissioners consider appropriating additional capital funding for the middle <br />school project sufficient to preclude any further reductions to the contemplated 123,000 square <br />foot design. <br />The BOCC tasked County staff to conduct an independent assessment of factors affecting the <br />school construction project costs. Their analysis and findings are provided in an attached <br />narrative and associated spreadsheet, and will be explained by staff during the BOCC's January <br />24 meeting. <br />In accordance with the BOCC's November 2000 "Policy on Planning and Funding School <br />Capital Projects ", OCS is requesting that the Board adopt a revised capital project ordinance <br />that would appropriate funds for the balance of the project. Under the policy, Middle School #3 <br />qualifies as a Level 2 project, which is structured in four phases. The project is now at the <br />Design and Construction Phase, which includes final design, facility construction and purchase <br />of equipment, furnishings, technology, and one -time start up items. The remaining phase, the <br />Final Accounting Phase, comes at project completion and provides a reconciliation of actual <br />project expenditures with the approved project budget. <br />As noted in the attached January 24, 2005 OCS agenda item, the Superintendent is <br />recommending that the Board of Education award a total of multi -prime base bids and <br />recommended alternates in the amount of $18,273,846. That amount, if approved, would bring <br />the total estimated Middle School #3 project cost to $22,608,091. The BOCC has allocated the <br />previously mentioned $18.5 million in general obligation bonds towards the project cost. OCS <br />has also identified $350,000 of its own funds ($300,000 from sales tax reimbursements and <br />$50,000 from the North Carolina Department of Transportation) to help pay for the project. The <br />BOCC has previously appropriated, through the Soccer Superfund Capital Project Ordinance, <br />$237,525 to pay for the County's share of the pre- grading /sitework being administered by OCS <br />for the middle school and soccer center sites. <br />