Browse
Search
ORD-2005-005 - Middle School #3 Capital Project Ordinance 01-24-2005-6a
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2005
>
ORD-2005-005 - Middle School #3 Capital Project Ordinance 01-24-2005-6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 12:10:30 PM
Creation date
9/29/2010 4:04:45 PM
Metadata
Fields
Template:
BOCC
Date
1/24/2005
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6a
Document Relationships
Minutes - 20050124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dr. Shirley Carraway <br />RE: Middle School #3 Bid Tabulation <br />December 15, 2004 <br />page 2 <br />C. Electrical Contractor: Starr Electric Co., Inc. <br />6 Battleground Court <br />Greensboro, NC 27408 <br />Base Bid: $ 1,649,000 <br />Alt. #3: Front Entrance Canopy: $ (8,600) <br />Alt. #4: Photovoltaic system /power <br />storage/ distribution System $ 14,000 <br />Alt. #13: Security System by Ademco: $ No change <br />Total Base Bid + accepted Alternates: $ 1,654,400 <br />D. Plumbing Contractor: ABL & Associates Plumbing, LLC <br />300 Hoke Street <br />Raleigh, NC 27601 <br />Base Bid: $ 1,050,899 <br />Alt. #5: Solar Water Heating System: $ 51,728 <br />Alt. #3: Canopy Roof Leader: 3,819 <br />Total Base Bid + accepted Alternates: $ 1,106,446 <br />TOTAL MULTI -PRIME BASE BIDS AND RECOMMENDED ALTERNATES: $18,273,846 <br />Summary: General Construction: $13,568,000 <br />HVAC: 1,945,000 <br />Electrical: 1,654,400 <br />Plumbing: 1,106,446 <br />$18,273,846 <br />The above construction bids, added to the early sitework package contract (presently under <br />construction) and the playing field and irrigation work (contract pending), equals $18,983,091. On <br />September 9, 2004, we presented to the School Board an estimate of $18,826,700 for the same scope <br />of work. The difference between the estimate and the actual bid is less than 1 %, which confirms the <br />timeliness and accuracy of the estimate. <br />Based on this information, we recommend moving forward with preparation of contracts for the <br />new middle school for the Orange County Board of Education. <br />Please contact me if you have any questions or comments. <br />Sincerel , <br />e th ed oot, AIA <br />ice President <br />KER:esw /0310- bid.rec <br />CC. George McFarky, Jr. <br />IIICORLEY REDFOOT ZACK,.,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.