CORLEY IREDFOOT ZACKINC.
<br />ARCHITECTS • ENGINEERS • PLANNERS
<br />December 15, 2004
<br />10
<br />LAURENCE W. BUNCH, AIA
<br />Associate In accordance with your request, I am sending you the certified bid tabulation
<br />ANDREW R. CRUICKSHANK, AIA for the above - referenced project. Bids for a single prime and for multi prime
<br />Associate contracts were opened at 4:00 PM on December 7, 2004, at the School Board
<br />DAVID M. TAYLOR, AIA building in Hillsborough, NC.
<br />lssociate
<br />HARRY M. JENSEN Listed below are the apparent low multi -prime bidders, based on their Base
<br />Associate Bids and the Alternates which were reviewed and approved in our discussions
<br />KENNETH E. SMITH with you and George McFarley, Jr., on December 14, 2004:
<br />Associate
<br />A. General Construction: J. H. Allen , Inc.
<br />409 W. Central Avenue (27203)
<br />PO Drawer 2809
<br />Asheboro, NC 27204
<br />Base Bid: $13,445,000
<br />Alt. #3: Front entrance canopy 108,000
<br />Alt. #4: Photovoltaic system /power storage/ -
<br />PO Box 2368 distribution system 5,300
<br />Chapel Hill, NC 27515 -2368 Alt. #5: Solar water heating system 9,700
<br />Alt. #15: Use specific brands for kitchen equipment no change)
<br />222 Chapel Cloister Hill, coon Total Base Bid + accepted alternates: $13 568,000
<br />Chapel Hill, NC 27514 -2212 p �
<br />B. HVAC Contractor: Indicor
<br />1217 Rail Street (27407)
<br />PO Box 8794
<br />Greensboro, NC 27419
<br />Base Bid: $ 1,849,000
<br />Alt. #9: HVAC Equipment by Trane: $ No change
<br />Alt. #10: Boilers by Weil McClaim with
<br />Webster Burners: $ No change
<br />Alt. #11: HVAC Pumps by B &G: $ 8,000
<br />(919) 942 -8586 Telephone Alt. #12: HVAC Control by Invensys
<br />(919) 929 -4802 Fax supplied by Yamas: 88,000
<br />Total Base Bid + accepted Alternates: $ 1,945,000
<br />Dr. Shirley Carraway, Superintendent
<br />Orange County Schools
<br />200 East King Street
<br />GLENN D. CORLEY, AIA
<br />Hillsborough, NC 27278
<br />President, CEO
<br />KENNETH E. REDFOOT, AIA
<br />RE: Middle School #3
<br />Vice President
<br />West Ten Road, Orange Co., NC
<br />MARK ZACK, AIA
<br />Project #0310
<br />Vice President
<br />BID TABULATION
<br />MICHAEL L. HAMMERSLEX PE
<br />Principal
<br />Dear Dr. Carraway:
<br />10
<br />LAURENCE W. BUNCH, AIA
<br />Associate In accordance with your request, I am sending you the certified bid tabulation
<br />ANDREW R. CRUICKSHANK, AIA for the above - referenced project. Bids for a single prime and for multi prime
<br />Associate contracts were opened at 4:00 PM on December 7, 2004, at the School Board
<br />DAVID M. TAYLOR, AIA building in Hillsborough, NC.
<br />lssociate
<br />HARRY M. JENSEN Listed below are the apparent low multi -prime bidders, based on their Base
<br />Associate Bids and the Alternates which were reviewed and approved in our discussions
<br />KENNETH E. SMITH with you and George McFarley, Jr., on December 14, 2004:
<br />Associate
<br />A. General Construction: J. H. Allen , Inc.
<br />409 W. Central Avenue (27203)
<br />PO Drawer 2809
<br />Asheboro, NC 27204
<br />Base Bid: $13,445,000
<br />Alt. #3: Front entrance canopy 108,000
<br />Alt. #4: Photovoltaic system /power storage/ -
<br />PO Box 2368 distribution system 5,300
<br />Chapel Hill, NC 27515 -2368 Alt. #5: Solar water heating system 9,700
<br />Alt. #15: Use specific brands for kitchen equipment no change)
<br />222 Chapel Cloister Hill, coon Total Base Bid + accepted alternates: $13 568,000
<br />Chapel Hill, NC 27514 -2212 p �
<br />B. HVAC Contractor: Indicor
<br />1217 Rail Street (27407)
<br />PO Box 8794
<br />Greensboro, NC 27419
<br />Base Bid: $ 1,849,000
<br />Alt. #9: HVAC Equipment by Trane: $ No change
<br />Alt. #10: Boilers by Weil McClaim with
<br />Webster Burners: $ No change
<br />Alt. #11: HVAC Pumps by B &G: $ 8,000
<br />(919) 942 -8586 Telephone Alt. #12: HVAC Control by Invensys
<br />(919) 929 -4802 Fax supplied by Yamas: 88,000
<br />Total Base Bid + accepted Alternates: $ 1,945,000
<br />
|