Browse
Search
2006 S ERCD - MOA Town of Hillsborough Planning for Fairview Park County Parks Operations Base and Town and County Public Works Facilities
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 S ERCD - MOA Town of Hillsborough Planning for Fairview Park County Parks Operations Base and Town and County Public Works Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2010 11:09:31 AM
Creation date
9/28/2010 11:09:30 AM
Metadata
Fields
Template:
BOCC
Date
12/12/2006
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9g
Document Relationships
Agenda - 12-12-2006-9g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 12-12-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />A. CHARGE to the Master Plan Committee: <br />Develop a Master Plan for the Site, within the framework of any operating guidelines or <br />other instructions as offered by the elected Boards, to include the following: <br />1. A map of the Site with the design for the Fairview Park, including proposed <br />buildings, playing fields, roads, parking, trails, other facilities, amenities, <br />infrastructure locations, vegetative cover, hydrology and other components that <br />are commonly included in a park. or public facility concept plan The map of the <br />Site shall include existing and planned buildings of the County Pazks Operations <br />Base and the Town and County Public Works facilities. Planning of the County <br />Pazks Operations Base and the Town and County Public Works facilities is <br />limited to the location of buildings, roads, pazking and other infrastructure. <br />2. A written report outlining the proposed uses; the design rationale, ,description of <br />work group process, natural and cultural features, means. of soliciting community <br />input, the potential future phases, and construction cost estimates. If needed, the <br />report should also include a phasing plan, showing how the Fairview Pazk and <br />other public facilities could be developed over time ~in a cost-efficient fashion. <br />The report should include a recommendation concerning which facilities should <br />be constructed, utilizing the funds remaining from the $850,000 allocated for the <br />project after the planning, design, and survey work (estimated to cost $200,000) <br />have been completed. <br />3. The report should address and recognize the limitations imposed by safety <br />considerations caused by the Fairview pazk site's previous use for waste-disposal, <br />as addressed inpart by a geo-technical report prepared in 1999 ("Report of <br />Geotechnical Evaluation, Closed Hillsborough Landfill Site, July 19, 2000'x. <br />Further recommendations maybe needed to address phased remediation of <br />portions of the Fairview park site. <br />4. The Master Plan should address co-location of existing and future public facilities <br />and provide for a synergy and compatibility of uses between pazk functions and <br />other public functions wherever possible. The rights of neighbors should be <br />respected by buffering incompatible uses. <br />5. The Committee should review the "old" 1988 Fairview Park Concept Plan as part <br />of the Master Plan and determine its validity, if any. <br />2. EXPECTATIONS OF MASTER PLAN FINAL PRODUCT /MEMBERSHIP OF <br />MASTER PLAN COMMITTEE <br />Product: A Master Plan report and map, as described above. <br />Timeframe for Product: by September, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.