Orange County NC Website
m) The Special Use Permit shall include <br />a condition that the electro - magnetic <br />radiation levels maintain compliance <br />with requirements of the Federal <br />Communications Commission, <br />regarding emission of electromagnetic <br />radiation. Within 30 days of installation <br />of equipment on the tower, and within <br />30 days of the installation of any <br />additional equipment in the future, the <br />tower owner shall provide <br />documentation of emission levels in <br />relation to FCC standards. In addition, <br />the tower owner must provide <br />documentation of emission levels within <br />five working days if so requested by <br />Orange County. Orange County may <br />make such requests at any time, not to <br />exceed two times per year. <br />X Yes No <br />n) High voltage and "No Trespassing" X Yes No <br />and other warning signs. <br />1. If high voltage is necessary for the <br />operation of the telecommunications <br />tower or any accessory structures, <br />"HIGH VOLTAGE - DANGER" warning <br />signs shall be permanently attached to <br />the fence or wall and shall be spaced <br />no more than forty (40) feet apart. <br />2. "NO TRESPASSING" warning signs <br />shall be permanently attached to the <br />fence or wall and shall be spaced no <br />more than forty (40) feet apart. <br />3. The letters for the "HIGH VOLTAGE - <br />DANGER" and "NO TRESPASSING" <br />warning signs shall be at least six (6) <br />inches in height. The two (2) warning <br />signs may be combined into one (1) <br />sign. The warning signs shall be <br />installed at least five (5) feet above the <br />finished grade of the fence. <br />4. The warning signs may be attached <br />to freestanding poles if landscaping <br />may obstruct the content of the signs. <br />5. Signs noting federal registration (if <br />required) shall be attached to the tower <br />structure in compliance with federal <br />regulation. <br />o) Equipment storage. Mobile or <br />immobile equipment not used in direct <br />support of a tower facility shall not be <br />stored or parked on the site of the <br />telecommunication tower, unless <br />repairs to the tower are being made. <br />p) Signs and advertising. The use of <br />any portion of a tower for signs or <br />advertising purposes including <br />company name, banners, streamers, <br />etc. shall be strictly prohibited. <br />X Yes <br />No <br />X Yes <br />No <br />X Yes <br />No <br />X Yes No <br />X Yes No <br />X Yes No <br />X Yes No <br />Because of the height of the tower <br />(distance of the antennas from the <br />ground), the facility is deemed <br />categorically excluded by the FCC. <br />(Please refer to the tower <br />consultant's report.) <br />Please refer to the attached photos of <br />the existing signage. These signs <br />Will be moved to the new facility. <br />(Pages 52 to 55) <br />Please refer to the attached photos of <br />the existing signage. These signs <br />will be moved to the new facility. <br />(Pages 52 to 55) <br />Please refer to the attached photos of <br />the existing signage. These signs <br />will be moved to the new facility. <br />(Pages 52 to 55) <br />The existing warning signs will be <br />moved to the new location. (Pages <br />52 to 55) <br />The existing warning signs will be <br />moved to the new location with the <br />new registration numbers. (Pages 52 <br />to 55) <br />Other than that equipment required <br />for the operation of the tower, no <br />other equipment will be stored at.the <br />tower site. <br />Advertising is strictly prohibited and <br />not proposed by the applicant. <br />32 <br />32 <br />