Orange County NC Website
3. The location and character of <br />the use, if developed according <br />to the plan submit -ted, will be in <br />harmony with the area in which it <br />is to be located and the use is in <br />compliance with the general plan <br />for the physical development of <br />the County as embodied in these <br />regulations or in the <br />Comprehensive Plan, or portion <br />thereof, adopted by the Board of <br />County Commissioners. <br />X Will _ Will Not <br />The proposed tower is a <br />replacement tower for the <br />existing 150 -foot communi- <br />cations tower, which has been <br />in use since 1984. The <br />proposed new local is just to <br />the east of the existing tower <br />in the same forested tract. No <br />change in use or intensity of <br />use is foreseen. The applicant <br />will provide additional <br />evidence at the Planning <br />Board meeting. <br />ARTICLE 8.6 AND 8.8 - APPLICATION COMPONENTS ( "Yes" indicates compliance, "No" indicates non - compliance) <br />19 <br />19 <br />PLANNING <br />BOARD /STAFF <br />EVIDENCE SUBMITTED <br />RECOMMENDED <br />TO SUPPORT FINDINGS <br />FINDINGS <br />Ordinance Reouirements <br />8.6 - Application submitted on forms <br />X Yes No <br />A complete application on <br />providing full and accurate description <br />appropriate forms has been <br />of proposed use, including location, <br />submitted and is attached. <br />appearance and operational <br />(Pages 40 and 41) <br />characteristics. <br />8.8 a) - Twenty-six (26) copies of the <br />X Yes No <br />Twenty-six (26) copies of the "as <br />site plan prepared by a registered land <br />built" site plan, prepared by <br />surveyor, architect, or engineer. <br />Keener, Williams, & Adams have <br />been submitted. <br />8.8 b) - Elevations of all proposed <br />X Yes No <br />An elevation drawing is attached. <br />structures to be used in the <br />development. <br />8.8 c) - Twenty-six (26) copies of the <br />_X —Yes No <br />Ten (26) copies of the <br />Environmental Assessment and/or <br />Environmental Assessment have <br />Environmental Impact Statement, if <br />been provided. <br />required, by the Orange County <br />(Pages 64 to 71) <br />Environmental Impact Ordinance. <br />8.8 d) - A fee, as set by the Orange <br />X Yes No <br />Application fees in the amount of <br />County Board of Commissioners. <br />$2,736.85 for the PD amendment <br />and $10,000 for the tower SUP <br />have been paid. (Receipt copy <br />found on pages 42, 42a, 42b, and <br />43) <br />8.8 e) — Method of disposal of trees, <br />X Yes No <br />Cleared tress will be properly <br />limbs, stumps, and construction debris. <br />landfilled. PEMC proposes to <br />deconstruct the old tower and <br />make the material available to <br />other public agencies, such as <br />EMS for their future needs. <br />19 <br />19 <br />