Browse
Search
ORD-2006-105 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2006
>
ORD-2006-105 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:24:34 AM
Creation date
9/28/2010 9:36:09 AM
Metadata
Fields
Template:
BOCC
Date
12/12/2006
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8a
Document Relationships
Agenda - 12-12-2006-8a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 12-12-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
144 <br />3) Lighting: Since it will be more than 199' in height, the tower will require <br />lighting. To minimize the effects of the otherwise unnecessary and <br />preventable "ground . scatter" effect of lighting, Piedmont Electric <br />Cooperative shall use technology that either shields the light from being <br />able to be seen from the ground or that will prevent it from being seen at 12 <br />degrees vertical height for a distance of 1 mile. <br />4) Once Piedmont has met all the conditions of the permit and any other <br />requirements of the'County and a building permit has been issued, they must <br />notify the County's consultant if an inspection is required which is not <br />performed by the County. <br />5) At the completion of construction the Applicant must notif the County's <br />consultant and provide proof that all inspections have been satisfactorily <br />completed and the project. is ready for a final on -site inspection. Upon <br />passing the final inspection by the County's consultant a recommendation <br />regarding the issuance of a certificate of occupancy shall be made. <br />6) After the County's receipt of CMS's final invoice, all moneys owed the <br />County must have been paid before the facility shall be allowed to be used to <br />transmit or receive. <br />7) Piedmont shall not be permitted to actually use the facility to transmit or <br />receive data until the Certificate of Occupancy or its functional equivalent <br />has been issued or risk forfeiting its Permit. <br />This constitutes our recommendation to the County as regards the issuance of a <br />Special Use Permit, including conditions, to Piedmont Electric Membership <br />Corporation for this proposed site. If you have questions, please contact Jackie <br />Hicks at (919) 622 -5448 or me at (919) 562 -3945. <br />Sincerely, <br />P-S. (J mt*) .tone (Electronic Signature) <br />L.S. Monroe <br />cc: Ms. Jackie Hicks, Director; ,Mid- Atlantic Region <br />
The URL can be used to link to this page
Your browser does not support the video tag.