Browse
Search
ORD-2006-105 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2006
>
ORD-2006-105 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:24:34 AM
Creation date
9/28/2010 9:36:09 AM
Metadata
Fields
Template:
BOCC
Date
12/12/2006
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8a
Document Relationships
Agenda - 12-12-2006-8a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 12-12-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
136 <br />March 30, 2006 <br />Dear Orange County Property Owner: <br />This letter is to notify you that Piedmont Electric Membership Corp. is planning on <br />replacing its existing 200' (ft) communication tower with a new 350' (ft) communication <br />tower on its headquarters property located at 2500 Hwy 86 South. Piedmont Electric <br />Membership Corp. -will make application to the Orange County Planning and Inspections <br />Department for ari amendment to the Planned Development -Special Use Permit to include <br />the new tower. <br />You are being notified as one of the nearby property owners that must be notified <br />according to the Orange County planning regulations. <br />According to the regulations, Piedmont Electric Membership Corp. must provide a <br />balloon test to determine what visual impacts might be created by this new tower. <br />Therefore, this letter is notifying you that on Saturday, April 22, 2006, from gam to <br />12pm, a balloon will be floated at the elevation of the new tower. In case of inclement <br />weather, a back -up date of Monday, April 24, 2006 from Sam to 12pm will be set for the <br />test. <br />A balloon test notification sign will be posted at the front of the subject property with <br />directional arrows posted at intersections and nearby roads. Piedmont is required to fly a <br />brightly colored balloon at the height of the proposed tower as well as notifying all <br />landowners within 1,000' (ft) of their property no less than fourteen (14) days in advance <br />of the test date. <br />As a property owner you will have the opportunity to observe this test. <br />The new tower is being constructed by Piedmont Electric Membership Corp. to improve <br />the two -way radio coverage in our service area. The radio system will be part of the <br />Homeland Security services required by the fleet of "First Responders" who are called <br />upon in emergencies or disasters. <br />Your cooperation and assistance on this critical matter will be appreciated. <br />Sincerely yours, <br />Robin Blanton, P.E. <br />Manager of Engineering <br />Piedmont EMC <br />
The URL can be used to link to this page
Your browser does not support the video tag.