Orange County NC Website
5. Except for construction of the footpath and stormwater improvements, all areas in open <br />space shall remain in their natural condition. <br />6. The Cheek Tract and the Tanaka Tract shall be burdened by an easement for the benefit <br />of a homeowner's association(s) that permanently reserves the 33% of open space <br />depicted on the Preliminary Plan of both of these tracts for open space. Similarly, the <br />open space contained in Lots 10, 11 & 12 shall be burdened by an easement for the <br />benefit of the homeowner's association. The easements, in a form approved by the <br />County Attorney, shall be recorded contemporaneously with the recording of the Final <br />Plat. The Homeowner's Association(s) that benefits from the easements described in <br />this paragraph shall be organized and existing under the corporate law of the State of <br />North Carolina prior to recording any Final Plat. <br />F. Miscellaneous <br />The Final Plat shall contain a title block and vicinity map according to standards found in <br />Section V-D-2 and V-D-3 of the County Subdivision Regulations. <br />2. The Final Plat shall reflect the drainage easements as required in D.1 above. <br />3. The portion of open space not deeded to Orange County shall be conveyed by deed to the <br />Homeowner's Association(s). Provided, however, the open space conveyance as to the <br />open space located on the Cheek Tract and the Tanaka Tract shall be by deed of easement <br />with restrictive covenants. All instruments of conveyance and restriction shall be <br />approved by the County Attorney prior to their recording. <br />4. Before installation of lighting within the subdivision, the owner/applicant shall submit a <br />lighting plan to the Planning Department for review and approval. <br />5. The Planning and Solid Waste Departments shall review and approve a plan for the <br />collection and proper disposal of all tree stumps and fallen logs before the Final Plat <br />approval. <br />6. The owner/applicant shall note impervious cover square footage limits for each lot on the <br />Final Plat. <br />7. Clean wood waste, scrap metal, and corrugated cardboard, must be recycled. Burning of <br />construction debris and land clearing debris is prohibited. <br />8. All haulers of construction waste shall have proper licensing. <br />9. Before any on-site construction activity, the owner/applicant shall hold apre-construction <br />conference with the County Solid Waste staff. This maybe the. same meeting held with <br />other development officials. <br />10. Before installation of a subdivision sign, County Planning shall review and approve a site <br />plan and construction drawings. <br />