Orange County NC Website
Watershed Critical Area Mapping Options <br />11/14/2006 <br />Assumptions for 1. The 1984 West Orange Study citing groundwater <br />Options 1,2. "interflow" is not being considered <br />2. 1987 Water Supply Study for proposed impoundments of <br />the Eno River above McGowan Creek and Seven Mile <br />Creek is the basis for the critical area and watershed <br />delineations. <br />3. The BOCC wanted to buffer the river channel above the <br />Eno River above McGowan Creek Reservoir and the area <br />between Seven Mile Creek Dam and Lake Ben Johnston, <br />which was not listed in the Zoning Ordinance text. <br />4. The `stream order' system of stream classification is not <br />considered is not considered to capture higher order <br />streams flowing into existing or proposed impoundments <br />or public water supply intakes. <br />( fat,.Olin1PG:lCi „t•.a1 III 3;:g {?., $t.J'a z;':iii';it Pub i= L, f {f::l. "i i?S:S' Nov "i } Oil : { -aini 'Y F li ^ i�tia r?: ^:5.?..:ivl app ffip;t):Y')ril l;•irEt{:�iFSOilS.vfa:: <br />