Orange County NC Website
I <br />West Fork on the Eno (Ph2) f <br />640' NPE (643' actual) <br />2 <br />Lake Orange <br />615' NPE <br />Eno River above <br />McGowan Creek(Site 8) <br />585' NPE (actual) <br />c a <br />4f <br />5 -6 <br />5✓ 6 <br />r Corporation Lake <br />dual <br />(538' 1 E <br />actual NPE) <br />7 -8 <br />J <br />4 <br />Seven Mile Creek (proposed) <br />580' NPE <br />(581' actual proposed NPE) <br />n <br />u <br />all <br />1 <br />y 16 <br />Upper Eno <br />Critical Area <br />2006' <br />Le end <br />1/2 mile buffer West Fork <br />@ 640' NPE (643' actual) <br />{° 1/2 mile buffer of Lake Orange <br />0 @ 615' NPE (actual) <br />1/2 mile buffer of Eno River <br />1 between West Fork dam <br />0 and 'Eno River above McGowan <br />— Creek' <br />I 1/2 mile buffer of proposed <br />'Eno River above McGowan Creek' <br />@ 585' NPE (actual) <br />1/2 mile buffer of Corporation Lake <br />minus ridgeline area at the dam <br />(State DEM) <br />f 1/2 mile buffer of Lake Ben Johnston <br />and stream below Corporation Lake <br />intake point to Lake Ben Johnston <br />(State DEM) <br />1/2 mile buffer of stream <br />between Lake Ben Johnston <br />and Seven Mile Creek (prop) <br />h 1/2 mile buffer or proposed <br />10 Seven Mile Creek @ 580' <br />1/2 mile buffer of Rocky Run <br />11 stream for the last 6011 feet <br />before entering Lake Ben Johnston <br />1994 Adopted Upper Eno Critical Are <br />Water Supply Watershed <br />Hillsborough ETJ; City Limits <br />Streams <br />+ Streams between Impoundments <br />+ Rocky Run - 6011' <br />�- Existing Impoundments <br />Lake Ben Johnston <br />515' NPE <br />zone <br />