Browse
Search
Agenda - 09-21-2010 - 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 09-21-2010 - Regular Mtg.
>
Agenda - 09-21-2010 - 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2015 4:20:18 PM
Creation date
9/20/2010 8:57:15 AM
Metadata
Fields
Template:
BOCC
Date
9/21/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 09-21-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> .. . - . Y.{ � , <br /> 2 <br /> 02 StTE WORK <br /> MATERIAL LABOR SUBCONTRACT TOTALCOS <br /> Hem DescripGorr Quantity u!m uJc To.t�i.: :�:u!c Total ulc Toial <br /> Water Line Work 1 LS -. 24,000.00 20,004 $20,OOQ <br /> SUBTOTAL•SITE WORK $O SO $20,(100 $20,000 <br /> 02 SELECTIVE DEMOL1TtON <br /> • MAT�JiIAI. LABOR SUBCONTRACT TOTAL COST <br /> Item Descri Uon QuanGfy u!m uk Total ulc Total u!c Total <br /> Demolillon&Matadal Removal ey Others 0 0 0 0 <br /> 5UBT�TAL-5El.ECTIVE DEMOLITION $0 $0 $Q $Q <br /> 03 CONCRETE <br /> MAT6RfAL LABOR SUBCONTRACT T07ALCOST <br /> Ifem Descdption QuanUty u!m ulc Toi� u/c Total u/c Total <br /> Patch!Infiq Floor Slab 280 SF 0 0 725 2,030 2,030 <br /> suarorn�.•coNC� 0 0 2,030 $2,030 <br /> os woo�s Pr.nsncs <br /> MATERIAL LABOR SUBCONTRACT TOTALCOST <br /> Item Descdptbn Qu�tity ulm uk Total u/c Total u/c Total <br /> 7reated Blockfng 923 BF 0.85 784 0.85 784 0 1,5fi8 <br /> Casew+ork: <br /> -base cab(nefs 40 LF 0 ' 0 190 7,600 7,600 <br /> -wail c�inals 40 LF 0 0 125 6,000 5,d0� , <br /> Archifecfural woodwork 9 Ls o 0 26,OOO . 26,OOa 26,000 <br /> Wood Trim: <br /> -wood base 668 LF 0 0 3.80 2,536 2,538 <br /> -chalC ral! 418 LF 0 0 3.50 1,463 1,463 <br /> -woodwalnscot ' 1,672 SF 0 0 8.25 13,794 13,794 <br /> -crown ma�id[ng 418 LF 0 0 4.80 2,006 2,006 <br /> Wood Handraif/Bradcets 18 LF 0 0 18 324 324 <br /> Rouqh Frarrdng @ P[a�orm 240 SF 0 0 8 i,920 1,920 <br /> Rough Hardware 1 LS 350 350 0 0 350 <br /> SUBTOTAL•WOOD&pLASTICS 4,134 784 $60,64b $62,563 <br /> O7 MOESTURE&7HERMAL PR07ECTION <br /> MATERIAL LABOR SUBCONTRACT TOTALCOST <br /> Item Qescription Quantity u!rn u!a To(af uJc Total u(c Tofal <br /> Insulat{on, 0 0 <br /> -sound batf,4" 3,936 5F fl 0 �,5U 1,968 1,968 <br /> Caulking&Sealanls i l.S 0 0 350 350 350 <br /> SUBTOTAL-N}OtSTURE&FH�tMAL PROTECTiON 0 0 $2,318 $2,318 <br />
The URL can be used to link to this page
Your browser does not support the video tag.