Orange County NC Website
10 <br /> 5 <br /> susror�t gz2,s21 &t,�o2 �sza,7s1 �1,�ea <br /> Sales Ta�c 7.096 $9,562 $9�5fi2 <br /> t.abor Burden 38,5°,5 �1,733 $�,733 <br /> SU9TOTAL � $�q ggp <br /> General RequlremenEs 5,0% $32,744 $32,744 <br /> SUBTOTAL $887,524 <br /> Overhead 8 Proflt 7.00% �q5,g42 $45�842 <br /> SUBTOTAL �73g q� <br /> Payment&PerFormance Bond t25% $9,166 #9,168 <br /> Builders'Wsk(nsurance 025% 31,834 51,634 <br /> SUB70TAL $744,467 <br /> +Deslgn Contirtgency 5.00� $37,223 $37,�3 <br /> TOTAL ESTIMATED PROSABLE CONSTRUCTION COST $781,691 , <br /> unifcost 592.67 persq,ft, <br />