Browse
Search
2006 NS Contract - Revision of Louis Berger Group Contract to Complete TDR Phase III
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Revision of Louis Berger Group Contract to Complete TDR Phase III
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 11:47:39 AM
Creation date
9/15/2010 4:14:11 PM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
9d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Transfer of Development Rights Feasibility Study 8 <br />Phase Ill Scope of Services (8.31.2006) <br />E. Prepare for TDR Implementation Plan Adoption <br />1. Working Group Meeting No. 3/Public Meeting: TDR Program Review. The <br />Consultant will conduct one (1) public work session with the Working <br />Group to familiarize the public and property owners with the proposed <br />TDR ordinance language; staffing and implementation cost estimates; the <br />proposed Evaluation Measures; and to receive public feedback. The <br />Client and Consultant will agree to a format for this meeting in advance <br />of its being scheduled. The Consultant agrees to provide a minimum of <br />three (3) staff to support and facilitate this meeting for period not to <br />exceed 3.5 hours. The Client will distribute an agenda prepared by the <br />Consultant at least one week in advance of the Work Group meeting and <br />prepare summary minutes from this meeting. <br />2. Two Elected/Appointed Official Presentations. The Consultant will present <br />public feedback findings at one (1) Planning Board meeting and one (1) <br />meeting of the Orange County Board of Commissioners. The Consultant <br />will revise TDR Plan, ordinance language, and implementation cost <br />estimates as needed based on direction from the County Commission. <br />3. Preparation of Project Report. The Consultant will prepare five draft and <br />five final copies plus one unbound original of a final Project Report. The <br />Final Report will contain a complete set of recommendations on Program <br />Design, Administrative Design, Ordinance Revisions, and Implementation <br />Schedule. Appendices available on CD-ROM in each of the final reports <br />will include materials generated from or received during the previous <br />tasks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.