Orange County NC Website
-1 <br />Oranoe Countv -Animal Services Building <br />Architectural and Engineering Fees + <br />A. Basic Services -Architectural and Engineering <br />Dixon Weinstein Architects, Architect of Record <br />Animal Arts, Consultants <br />Spring Stoops McCullen Engineering, PME Engineers <br />Neville Engineering, Structural Engineers <br />Assume $4,250,000. construction budget @ 9.75% fee <br />Schematic Design 15% 62,156. <br />Design Development 20% 82,875. <br />Construction Documents 35% 145,032. <br />Bidding/Awarding 5% 20,718. <br />Construction Administration 25% 103,594. <br /> $414,375. $414,375. <br />B. Additional Services -Architecture and Engineering Not to Exceed <br />1. Architect -Dixon Weinstein Architects, Chapel Hill, NC <br />Pre-Design <br />Needs Assessment Workshop & Report 10,000 <br />Site Inventory and Analysis 2,500. <br />Master Planning with alternatives 5,000. <br />Initial meetings with Town 1,500. <br />Overall project budget and schedule ,500. <br />Pre-Design presentation ,500. <br /> $20,000. $20,000. <br />Peer Review - 2 to 4 meetings $2,500. <br />Consultant -Animal Arts, Boulder, CO <br />Needs Assessment Workshop and Report 8,000. <br />Equipment and caging design and <br />specifications 24,500. <br />Design Services included in <br />basic services list Part A <br />$32,500. $32,500. <br />3.Consul tant -Civil Consultants, Durham, NC <br />Pre-Design 5,000. <br />Schematic/Master Planning 6,000. <br />Design Development 15,000. <br />Construction Documents 32,000. <br />Off-site Utilities 12,000 <br />Bidding/Construction 13,000. <br /> $83,000. $83,000. <br />Dixon Weinstein Architects October 23, 2006 <br />