Browse
Search
2006 S Purchasing - Consideration for Approval: Expanded County Campus Proposal
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 S Purchasing - Consideration for Approval: Expanded County Campus Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2011 4:29:36 PM
Creation date
9/15/2010 3:59:38 PM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8a
Document Relationships
Agenda - 11-02-2006-8a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2006\Agenda - 11-02-2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Construction Method. <br />Construction management at risk contract. (G.S. §143-128(al)(4)). <br />4. Construction Manager at Risk. <br />TCM to contract with the County as provided in G.S. §143-64.31. <br />TCM: <br />(1) will provide construction management services for the Project throughout <br />the preconstruction and construction phases, and <br />(2) will guarantee the cost of the Project will not exceed the budgeted Project <br />Cost of $17,939,079.1 <br />This guaranteed Project Cost will be adjusted in the event (1) the County <br />introduces any changes to the scope of the work envisioned by TCM and the <br />design professionals2 or (2) TCM is delayed in the commencement of <br />construction by reason of the public bid process or by reason of matters <br />reasonably beyond TCM's control. <br />TCM remuneration: retention of private elements and the amount by which the <br />budgeted Project Cost exceeds actual Project Cost incurred. <br />5. TCM Construction Method. <br />TCM will publically advertise, prequalify and accept bids on a single prime basis <br />from licensed general contractors. <br />TCM and the County will develop mutually agreeable prequalification criteria <br />including, but not limited to: <br />1This sum to be reduced by those portions of the contract balances remaining to <br />be paid to design professionals whose contracts must be assigned to the County pursuant <br />to G.S. §143-64.31. <br />ZThe Project budget contemplates that TCM will deliver a shell and the upfitted <br />space, the latter as specified by the County. The Project budget includes an upfit <br />allowance of $35/ft2 for the office building interior and an upfit allowance of $55/ft2 for <br />the library interior. The Project Cost will be adjusted to the extent the office building and <br />library interiors upfit costs exceed the budgeted office building and library interior <br />allowances contained in the guaranteed Project Cost. The interior upfit costs shall be <br />identified in the bid documents and the cost to upfit the interiors shall be identified in the <br />construction bid(s). <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.