Browse
Search
2006 NS Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:37:57 AM
Creation date
9/15/2010 12:41:48 PM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5i
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Robert Edwards <br />Address: 500 Domains Ave. <br />City: Chapel Hill, N.C. 27516 <br />Phone: 942-6186 <br />Date: July 21, 2006 <br />Foundation: <br />6. <br />Roof /Gutters: <br />Install a new crawlspace door and frame. Install a 2x6 pressure <br />treated frame and 3/4 inch pressure treated plywood door. Install <br />2 x 4 cross bracing to support door. Install new pressure treated lx4 <br />trim around opening. Install new galvanized hinges and locking hasp. <br />New door to open, close and lock properly. <br />Remove the shingles and felt paper to the sheathing. <br />Note:. Rehabilitation Specialist to inspect roof sheathing before <br />new felt paper is installed. Prepare sheathing for felt paper. <br />Check roof decking for exposed nails and damaged sheathing. <br />Install 15 lb felt paper, new vent boots, white eve starter, <br />galvanized chimney flashing and 25 year shingles. <br />Patch area around existing electric riser/mast. <br />Note: Shingles to be installed with proper fasteners and too <br />manufacturer specs. <br />2. Install continuous aluminum gutters and downspouts on all <br />fascias. Color of gutters and downspouts to match coil trim. <br />Note: Attach solid drain file to all downspouts. The front and rear <br />left downspout drain file can run beside the foundation drain tile. <br />The front right downspout drain tle shall run toward the right rear <br />away from the foundaton. Check the locating service for under- <br />ground utlites before digging. <br />Windows: <br />Page 3 <br />1. Install ten (10) vinyl construction windows with built in J-channel and <br />nailing flange. Install all necessary trim to properly install new windows. <br />(jamb extensions and matching casing) <br />New windows to be complete with screen, lock and openable sash. <br />Windows to open, close and lock properly. Apply alI caulk necessary <br />to seal off air leaks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.