Browse
Search
2006 NS Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:37:57 AM
Creation date
9/15/2010 12:41:48 PM
Metadata
Fields
Template:
BOCC
Date
11/2/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5i
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />Name: Kathy Atwater <br />Address: 314 Lindsay St. <br />City:. Chapel Hill, N.C. 27514 <br />Phone Number: 966-4321 <br />Date: September 5, 2006 <br />Roof: <br />3. Remove and replace 1 sheet of damaged plywood on the front <br />porch roof. Install matching plywood. Trim existing plywood on <br />both eves back to coil trim. (Approx. 3'~ The new eve starter shall <br />cover the exposed edge of plywood. <br />4. Install a shingle type ridge vent on the main ridge and dormer <br />ridge. Remove a 3" section of sheathing before installing <br />the ridge vent. <br />5. <br />Page 3 <br />Install new galvanized flashing on the chimney. Use a grinder to cut <br />groove for new flashing. Install step and counter flashing. <br />Caulk all areas to prevent water intrusion with silicone caulk. _ <br />6. Install approximately 40 ft of solid drain tle to the rear down- <br />spout. Refer to Rehab. Specialist for proper location. <br />Drain tle shall be below grade and drain to rear yazd. <br />Windows: <br />1. Remove all loose glazing and paint on the sunroom casement <br />window. Re-glaze and paint the exterior window with proper <br />paint. <br />Mechanical: <br />1. Remove the existing HVAC unit and ductwork. Install a new HVAC <br />split system. Unit to be sized in accordance with ASHR.AE/Manual <br />"T' specifications and ductwork design to be in accordance with <br />ASHRAE/Manual "D" specificatons. New heat/air system shall be a <br />complete operatonal system. Air conditon to be at least a 13 seer. <br />All duct work to be insulated. Both electrical and mechanical permits <br />are required. All work must pass the inspectons from the Chapel Hill <br />Inspectons Dept. Price to include new floor registers and return duct. <br />The existing gas piping maybe used provided in good working <br />conditon. Note: Mechanical contractor shall fizrnish paperwork <br />to certify meeting the above requirements. _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.