Orange County NC Website
4. Security shall be submitted and approved by the County Attorney guaranteeing the <br />removal of the tower in the event it is abandoned or unused for a period of 12 months. <br />A qualified contractor shall provide a cost estimate. The amount of the security shall <br />be 110 percent of the estimate. This must be completed before building permits are <br />issued. <br />5. County or State wireless communication systems shall be allowed free co- location <br />space on the PEMC tower, as offered. <br />6. De- constructed tower materials shall be made available to other public agencies, as <br />offered. <br />7. The tower facility and its equipment shall comply with all federal, state and local <br />emission requirements. <br />8. The electro- magnetic radiation levels shall maintain compliance with requirements of <br />the Federal Communications Commission, regarding emission of electromagnetic <br />radiation. Within thirty (30) days of installation of equipment on the tower, and <br />within 30 days of the installation of any additional equipment in the future, the tower <br />owner shall provide documentation of emission levels in relation to FCC standards. <br />In addition, the tower owner must provide documentation of emission levels within <br />five working days if so requested by Orange County. Orange County may make such <br />requests at any time, not to exceed two (2) times per year. <br />9. Two (2) ten -pound 2- A:20 -B:C dry chemical portable fire extinguishers shall be <br />installed at the site as required by Orange County Emergency Management. <br />10. The Special Use Permit will automatically expire within twelve (12) months from the <br />date of approval if the use has not commenced or construction has not commenced or <br />proceeded unless a timely application for extension of this time limit is approved by <br />the Board of County Commissioners as provided in 8.4.11 of the Orange County <br />Zoning Ordinance. <br />11. Any zoning violations present on the site shall be corrected prior to the issuance of a <br />Building Permit. <br />12. The issuance of a Building/Electrical Permit by the Inspections Division shall be <br />according to the approved site plan. <br />13. Piedmont Electric shall submit a report to the Inspections Division certifying <br />structural and electrical integrity at the time of the building permit review, upon <br />completion of the initial construction, and at intervals as specified in Section 6.18.4f <br />of the Orange County Zoning Ordinance. <br />14. Piedmont Electric shall keep inspection records and make them available upon <br />request to the Inspections Division during regular business hours. Inspections shall be <br />performed as required in Section 6.18.4 f of the Orange County Zoning Ordinance, as <br />recommended under EIA/TIA 222F of the American National Standards Institute <br />(ANSI). <br />