Browse
Search
ORD-2006-086 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2006
>
ORD-2006-086 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:33:39 AM
Creation date
9/14/2010 10:18:41 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2006
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8a
Document Relationships
Minutes - 20061003
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITelecommunication Tower Application 47 <br />a)1) Antenna dimensions are documented on the engineering drawings <br />included in Tab 9 of this Application Package and will be limited <br />to only those antennas required for two -way radio service. A <br />Professional Engineer seal is included on these drawings. Tower <br />capacity has been included for the addition of up to five (5) other <br />antenna systems. <br />b) Aircraft hazards have been researched and have been approved by <br />the FAA. Included in Tab 3 of this Application Package is the <br />approved documentation information from the FAA for this <br />referenced tower. <br />C) Stealth rooftop or building antennas are not applicable to this - <br />project. <br />d) Building or rooftop stealth antennas are not applicable to this <br />project. <br />e) Building or rooftop non - stealth antennas are not applicable to this <br />project. <br />f) All fees have been submitted and will be paid to Orange County as <br />required. An initial $1,000 escrow payment to begin the pre - <br />application process was submitted and accepted by Orange <br />County. <br />6.18.4 Minimum Standards for Telecommunication Towers <br />a) A complete Site Development Plan is included in Tab 10 of this <br />Application Package. Photos of the proposed tower were included <br />in the balloon test held on April 22, 2006 and are included in Tab 8 <br />of this Application Package. <br />b) This tower is being placed in a heavily wooded area at the PEMC <br />Headquarters. It has been situated so as to utilize as much of the <br />tree coverage as possible. The balloon test included in Tab 8 of <br />this report indicates that the new tower will practically be unseen <br />from the North looking South along Hwy 86 and from the South <br />near the Mini- Storage looking North along Hwy 86. The tower <br />will be visible along the east and west axis due to its location on <br />top of the hill. <br />C) A sealed drawing by a registered engineer in the State of North <br />Carolina of the proposed tower is included in Tab 9 of this <br />Application Package. Sheet 5 of the drawing package indicates <br />Prepared by: <br />Alexander Utility Engineering, Inc.. 6/28/2006 Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.