Browse
Search
ORD-2006-086 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2006
>
ORD-2006-086 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:33:39 AM
Creation date
9/14/2010 10:18:41 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2006
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8a
Document Relationships
Minutes - 20061003
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br />Recomendations <br />The Planning Staff has not received any information, which would establish grounds for making a negative finding on the <br />general standards. These standards include maintaining or promoting the public health, safety, and general welfare, <br />maintaining or enhancing the value of contiguous property, and the use being in compliance with the general plan for the <br />physical development of the County. The County' s telecommunications consultant recommends project approval. <br />The Planning Staff has reviewed the application, the site plan, and all supporting documentation and has found that the <br />applicant has submitted information for the specific standards and requirements. <br />Provided the Board of County Commissioners finds in the affirmative on the specific and general standards, the Planning <br />Staff recommends approval of the request. The Planning Staff does however, recommend the attachment of conditions to <br />the approval which are specified as follows: <br />1. Any lighting on the replacement tower shall be shielded so as not to be seen from the ground for a distance of <br />one mile at the height of twelve degrees (120) vertical. <br />2. The navigational lighting shall be white, rather than red, and the strobe period shall be the longest under FCC <br />regulations. <br />3. The height of the tower may not exceed three hundred fifty (350) feet, including the 30 -foot antenna at the top <br />of the tower above the pre - disturbance or pre - construction ground level. <br />4. Security shall be submitted and approved by the County Attorney guaranteeing the removal of the tower in the <br />event it is abandoned or unused for a period of 12 months. A qualified contractor shall provide a cost estimate. <br />The amount of the security shall be 110 percent of the estimate. This must be completed before building <br />permits are issued. <br />5. County or State agency wireless communication systems shall be allowed free co- location space on the PEMC <br />tower, as offered. <br />6. De- constructed tower materials shall be made available to other public agencies, as offered.. <br />7. The tower facility and its equipment shall comply with all federal, state and local emission requirements. <br />8. The elect ro-magnet ic radiation levels shall maintain compliance with requirements of the .Federal <br />Communications Commission, regarding emission of electromagnetic radiation. Within thirty (30) days of <br />installation of equipment on the tower, and within 30 days of the installation of any additional equipment in the <br />future, the tower owner shall provide documentation of emission levels in relation to FCC standards. In <br />addition, the tower owner must provide documentation of emission levels within five working days if so <br />requested by Orange County. Orange County may make such requests at any time, not to exceed two (2) times <br />per year. <br />9. Two (2) ten -pound 2- A:20 -B:C dry chemical portable fire extinguishers shall be installed at the site as required <br />by Orange County Emergency Management. <br />10. The Special Use Permit will automatically expire within twelve (12) months from the date of approval if the use <br />has not commenced or construction has not commenced or proceeded unless a timely application for extension <br />of this time limit is approved by the Board of County Commissioners as provided in 8.4.11 of the Orange <br />County Zoning Ordinance. <br />11. Any zoning violations present on the site shall be corrected prior to the issuance of a Building Permit. <br />12. The issuance of a Building /Electrical Permit by the Inspections Division shall be according to' the approved site <br />plan. <br />13. Piedmont Electric shall submit a report to the Inspections Division certifying structural and electrical integrity at <br />the time of the building permit review, upon completion of the initial construction, and at intervals as specified <br />in Section 6.18.4f of the Orange County Zoning Ordinance. <br />14. Piedmont Electric shall keep inspection records and make them available upon request to the Inspections <br />Division during regular business hours. Inspections shall be performed as required in Section 6.18.4 f of the <br />Orange - County Zoning Ordinance, as recommended under EIA/TIA 222F of the American National Standards <br />Institute (ANSI). <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.