Orange County NC Website
k) A -determination shall be made that X <br />the facility and its equipment will Yes <br />comply with all federal, state and <br />local emission requirements, and the <br />Special Use Permit shall include a <br />statement that the facility and its <br />equipment will comply with all <br />federal, state and local emission <br />requirements. <br />No The proposed PENIC tower will <br />not exceed the FCC peak power <br />limits. PENAC will meet all <br />applicable local, state and federal <br />requirements regarding <br />construction, height, location, <br />and transmit power levels. <br />m) The Special Use Permit shall X Yes No <br />include a condition that the <br />elect ro-magnetic radiation levels <br />maintain compliance with <br />requirements of the Federal <br />Communications Commission, <br />regarding emission of <br />electromagnetic radiation. Within <br />30 days of installation of <br />equipment on the tower, and <br />within 30 days of the installation <br />of any additional equipment in the <br />future, the tower owner shall <br />provide documentation of emission <br />levels in relation to FCC standards. <br />In addition, the tower owner must <br />provide documentation of emission <br />levels within five working days if <br />so requested by Orange County. <br />Orange County may make such <br />requests at any time, not to <br />exceed two times per year. <br />n) High voltage and "No X Yes No <br />Trespassing" and other warning <br />signs. <br />1. If high voltage is necessary for <br />the operation of the <br />telecommunications tower or any <br />accessory structures, "HIGH <br />VOLTAGE DANGER" warning <br />signs shall be permanently <br />attached to the fence or wall and <br />shall be spaced no more than forty <br />(40) feet apart. <br />2. "NO TRESPASSING" warning <br />signs shall be permanently <br />attached to the fence or wall and <br />shall be spaced no more than forty <br />(40) feet apart. <br />3. The letters for the "HIGH <br />VOLTAGE - DANGER" and "NO <br />TRESPASSING" warning signs <br />shall be at least six (6) inches in <br />height. The two (2) warning signs <br />may be combined into one (1) <br />sign. The warning signs shall be <br />installed at least five (5) feet <br />above the finished grade of the <br />fence. <br />4. The warning signs may be <br />attached to freestanding poles 'if <br />landscaping may obstruct the <br />content of the signs. <br />X Yes No <br />Because of the height of the <br />tower (distance of the <br />antennas from the ground), <br />the facility is deemed <br />categorically excluded by the <br />FCC. <br />Please refer to the attached <br />photos of the existing <br />signage. These signs will be <br />moved to the new facility. <br />Yes <br />Yes <br />32 <br />No <br />No <br />Yes No <br />Yes No <br />_X _Yes No Please refer to the attached Yes No <br />photos of the existing <br />signage. These signs will be <br />moved to the new facility. <br />X Yes No Please refer to the attached Yes _No <br />photos of the existing <br />signage. These signs will be <br />moved to the new facility. <br />X Yes No The existing warning signs Yes No <br />will be moved to the new <br />location. <br />32 <br />