Orange County NC Website
Alternate Tower Considerations 113 <br />Piedmont Electric Membership Corp <br />Having the tower installed at the PEMC facility will allow PEMC to control access to the <br />site and best protect their critical assets. <br />Summary <br />Based on the propagation studies, Homeland Security and NERC Guidelines, it is highly <br />recommended that approval be granted for the construction of the proposed 350 -foot self - <br />supporting tower at the PEMC facility. <br />Prepared by: <br />Alexander Utility Engineering, Inc. 6/28/2006 Page 3 of 3 <br />