Browse
Search
ORD-2006-086 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2006
>
ORD-2006-086 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:33:39 AM
Creation date
9/14/2010 10:18:41 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2006
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8a
Document Relationships
Minutes - 20061003
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
106 <br />Physical Security <br />NERC <br />Guideline <br />Guideline Title: Physical Security <br />Version: 1.0 <br />Revision Date: <br />Effective Date: June 14, 2002 <br />Purpose: <br />Each company should consider implementing physical security measures to <br />safeguard personnel and prevent unauthorized access to critical equipment, <br />systems, material, and information at critical facilities. <br />Applicability: <br />This guideline applies to facilities and functions that are considered critical to the <br />support.of the electricity infrastructure and the overall operation of the individual <br />company. <br />Each company is free to define and identify those facilities and functions it <br />believes to be critical, keeping in mind that the ability to mitigate the loss of a <br />facility through redundancies may make that facility less critical than others. <br />A critical facility may be defined as any facility or combination of facilities, if <br />severely damaged or destroyed, would have a significant impact on the ability to <br />serve large quantities of customers for an extended period of time, would have a <br />detrimental impact to the reliability or operability of the energy grid, or would <br />cause significant risk to public health and safety. <br />Guideline Statement: <br />This guideline recommends "best practices" for the electricity sector in the area <br />of physical security for facilities or functions identified as critical. It may be used <br />in conjunction with the Vulnerability and Risk Assessment guideline, which <br />assists companies in identifying critical facilities. <br />Table of Contents: <br />Version 1.0 Security Guideline: Physical Security <br />June 14, 2002 Page 1 of 4 <br />North American Electric Reliability Council <br />
The URL can be used to link to this page
Your browser does not support the video tag.