Browse
Search
ORD-2006-086 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2006
>
ORD-2006-086 - Piedmont Electric Membership Corporation (PEMC) Planned Development (PD-OI) and Special Use Permit, Class A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:33:39 AM
Creation date
9/14/2010 10:18:41 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2006
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8a
Document Relationships
Minutes - 20061003
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4) If a structural analysis shows a tower is not in compliance with. the <br />appropriate EIA standards, the owner shall submit an application to the <br />Inspections Division with a plan to bring the tower into compliance within six (6) <br />months. <br />19. An analysis by a North Carolina Licensed Professional Engineer (P.E. Analysis) <br />shall be performed and shall be submitted to the Inspections Division. The analysis shall <br />determine the tower's compliance or lack thereof with the EIA standard in effect at the <br />time the tower was constructed and when the most recent structural loading change was <br />made. If the tower does not meet the aforementioned EIA standards, the letter or existing <br />P.E. analysis shall include the types of modifications that would be required to bring the <br />tower, up to standard. The new, replacement tower shall be subject to the annual <br />electrical inspection conducted by the Inspections Division including any associated <br />inspection fees. <br />20. The Inspections Division shall be notified in writing when a required analysis is <br />complete. A copy_of the analysis report shall be made available to the Inspections <br />Division upon request. That report shall also give details of the net result of any changes <br />made to the tower or its appurtenances since the last inspection. <br />21. After the County's receipt of the Center for Municipal Solutions final invoice, all <br />moneys owed the County must have been paid before the facility shall be allowed to be <br />used to transmit or receive. <br />22. PEMC shall not be permitted use of the facility to transmit or receive data until the <br />Certificate of Occupancy or its functional equivalent has been issued. <br />23. If any condition of this Special Use Permit shall be held invalid or void, then this <br />Special Use Permit shall be void in its entirety and of no effect. <br />Upon motion of Commissioner , seconded by Commissioner , <br />the foregoing resolution was adopted this the _ day of , 200. <br />I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North <br />Carolina, DO HEREBY CERTIFY that the foregoing is a true copy of so much of the <br />proceedings of said Board at a meeting held on _, 200 as relates in any way to the <br />adoption of the foregoing and that said proceedings are recorded in the minutes of said Board. <br />WITNESS my hand and the seal of said County, this day of , 200 . <br />Clerk to the Board of Commissioners <br />
The URL can be used to link to this page
Your browser does not support the video tag.