Orange County NC Website
Orange County Schools <br />Capital Investment Plan 2009-2019 <br />29 <br />Project Title Year 1 <br />2010-11 Year 2 2011 <br />12 Year 3 <br />2012-13 Year 4 <br />2013-14 Year 5 <br />2014-15 Year 6 <br />2015-16 Year 7 <br />2016-17 Year 8 <br />2017-18 Year 9 <br />2018-19 Year 10 <br />2019-20 PROJECT <br />TOTAL <br />wa s Elementa School <br />Perimeter fencing $30,000 $30,000 <br />H draulic lift $12,000 $12,000 <br />GREEN building enhancements $150,000 $150,000 $300,000 <br /> <br />A.L. Stanback Middle School <br />Girls softball field construction $140,000 $140,000 <br />HVAC chilled water line insulation $40,000 $40,000 <br />Science lab renovations $300,000 $300,000 <br />Gym bleachers motorization $25,000 $25,000 <br />Track resurfacing $45,000 $45,000 <br />Football field irri ation system $30,000 $30,000 <br />Erosion control $15,000 $15,000 <br />H draulic lift $12,000 $12,000 <br />G m floor reconditioning $5,000 $5,000 <br />Classroom renovations (6th grade wing) $300,000 $300,000 $600,000 <br />GREEN buildin enhancements $150,000 $150,000 $300,000 <br />Cafeteria renovation $200,000 $200,000 <br /> <br /> <br />C.W. Stanford Middle School <br />Air handler re lacement $600,000 $600,000 <br />Parking lot and driveway resurfacin $40,000 $40,000 <br />Roof re lacement Sections 36 & 1A) $300,000 $300,000 <br />oof re lacement Sections 3A $225,000 $225,000 <br />oaf re lacement (Sections 1B & 1C $375,000 $375,000 <br />Replace exterior doors (100,200 bldg. & cafeteria) $250,000 $250,000 <br />440M Regulation track $400,000 $400,000 <br />Science lab renovations $200,000 $200,000 <br />Re lace intercom s stem $65,000 $65,000 <br />Hydraulic lift $12,000 $12,000 <br />G m floor reconditionin $5,000 $5,000 <br />GREEN building enhancements $150,000 $150,000 $300,000 <br />Auditorium construction $3,800,000 $3,800,000 <br /> <br /> <br /> <br /> <br />1/29/2010 <br />