Orange County Schools
<br />Capital Investment Plan 2009-2019
<br />29
<br />Project Title Year 1
<br />2010-11 Year 2 2011
<br />12 Year 3
<br />2012-13 Year 4
<br />2013-14 Year 5
<br />2014-15 Year 6
<br />2015-16 Year 7
<br />2016-17 Year 8
<br />2017-18 Year 9
<br />2018-19 Year 10
<br />2019-20 PROJECT
<br />TOTAL
<br />wa s Elementa School
<br />Perimeter fencing $30,000 $30,000
<br />H draulic lift $12,000 $12,000
<br />GREEN building enhancements $150,000 $150,000 $300,000
<br />
<br />A.L. Stanback Middle School
<br />Girls softball field construction $140,000 $140,000
<br />HVAC chilled water line insulation $40,000 $40,000
<br />Science lab renovations $300,000 $300,000
<br />Gym bleachers motorization $25,000 $25,000
<br />Track resurfacing $45,000 $45,000
<br />Football field irri ation system $30,000 $30,000
<br />Erosion control $15,000 $15,000
<br />H draulic lift $12,000 $12,000
<br />G m floor reconditioning $5,000 $5,000
<br />Classroom renovations (6th grade wing) $300,000 $300,000 $600,000
<br />GREEN buildin enhancements $150,000 $150,000 $300,000
<br />Cafeteria renovation $200,000 $200,000
<br />
<br />
<br />C.W. Stanford Middle School
<br />Air handler re lacement $600,000 $600,000
<br />Parking lot and driveway resurfacin $40,000 $40,000
<br />Roof re lacement Sections 36 & 1A) $300,000 $300,000
<br />oof re lacement Sections 3A $225,000 $225,000
<br />oaf re lacement (Sections 1B & 1C $375,000 $375,000
<br />Replace exterior doors (100,200 bldg. & cafeteria) $250,000 $250,000
<br />440M Regulation track $400,000 $400,000
<br />Science lab renovations $200,000 $200,000
<br />Re lace intercom s stem $65,000 $65,000
<br />Hydraulic lift $12,000 $12,000
<br />G m floor reconditionin $5,000 $5,000
<br />GREEN building enhancements $150,000 $150,000 $300,000
<br />Auditorium construction $3,800,000 $3,800,000
<br />
<br />
<br />
<br />
<br />1/29/2010
<br />
|