Orange County NC Website
Orange County Schools <br />Capital Investment Plan 2009-2019 <br />27 <br /> <br />Project Title Year 1 <br />2010-11 Year 2 2011 <br />12 Year 3 <br />201 Z-13 Year 4 <br />2013-14 Year 5 <br />2014-15 Year 6 <br />2015-16 Year 7 <br />2016-17 Year 8 <br />2017-18 Year 9 <br />2018-19 Year 10 <br />2019-20 PROJECT <br />TOTAL <br /> <br />Cameron Park Elementa School <br />Asphalt resurfacing (lower play area and front <br />arkin lot) $100,000 $100,000 <br />Facili aintin $10,000 $10,000 <br />Chilled water i e insulation $15,000 $15,000 <br />Streetsca a renovation $185,000 $185,000 <br />Lower layground shelter $15,000 $15,000 <br />Door replacement (Gym and hallways) $20,000 $20,000 <br />As halt resurfacin bus arkin lot $40,000 $40,000 <br />Bathroom renovations $120,000 $120,000 <br />Chiller re lacement $160,000 $160,000 <br />Roof re lacement lower level $250,000 $250,000 <br />Electronic securi door locks $35,000 ~ $35,000 <br />GREEN buildin enhancements $150,000 $150,000 $300,000 <br /> <br />Central Elementa School <br />Media Center window re lacement $30,000 $30,000 <br />Electronic securi door locks $35,000 $35,000 <br />Asphalt resurfacing (track and front parking lot <br />ex ansion $150,000 $150,000 <br />Draina a im rovements $10,000 $10,000 <br />Casework replacement (K-1 classrooms) $100,000 $100,000 <br />eplace the in classroom bathrooms $25,000 $25,000 <br />eplace all mini-blinds $25,000 $25,000 <br />Air handler re lacement $65,000 $65,000 <br />Roof re lacement (Section G $30,000 $30,000 <br />Repairceiling overhang (Media Center) $10,000 $10,000 <br />HVAC duct cleaning $26,500 $26,500 <br />Cover walkwa to 5th rode win $35,000 $35,000 <br />Enclose breezewa $275,000 $275,000 <br />Re lace g m sound s stem $6,000 $6,000 <br />Bathroom renovations $120,000 $120,000 <br />GREEN buildin enhancements $150,000 $150,000 $300,000 <br /> <br /> <br /> <br /> <br />