Orange County NC Website
Change Order Summary: Orange County Animal Services Facility <br />Clancy & Theys Construction Company <br />Updated: 8/6/2010 <br />co # PCO # Revision Description Cost: <br />1 001 Rl Add 24' RCP to Drain Pond $3,979.00 <br />1 <br />002 <br />Stockpile 1500 CY On Site <br />$5,803.00 <br />1 <br />003 <br />Undercut SW Comer of Pad <br />$5,582.00 <br />1 <br />004 <br />Haul Off Bad Topsoil <br />$3,215.00 <br />005 <br />Trench Rock Ca) 1303-1305 <br />$33,842.00 <br />006 <br />Trench Drains to Monolithic Concrete <br />($41528,00", <br />2 <br />010 <br />Rl <br />Pushbuttons @ OH Doors <br />$407.00 <br />2 <br />013 <br />R2 <br />Well, Cistern & Panel & Gear Rev. <br />$19,445:00 <br />2 <br />015 <br />Parking Lot Light Sleeves <br />$2,092.00 <br />2 <br />016 <br />Change Siding Color to Metallic <br />$1,809.00 <br />3 <br />018 <br />R1 <br />Add Landfill Sanitary Sewer <br />$247,758.00 <br />4 <br />020 <br />Bond for Landfill Sanitary <br />$5,711.00 <br />4 <br />039 <br />CMAR 6% OH&P on sanitary sewer plus bond prem. <br />$15,208.00 <br />5 <br />021 <br />R2 <br />Trench Rock & Rock Bores-SWOPS; <br />$216,281.00 <br />5 <br />R2 <br />Trench Rock Blasting-ASF <br />$97,870.00 <br />6 <br />022 <br />Delete Cistern Sub-Base <br />($51315,00) <br />6 <br />024 <br />1 R2 <br />Hardware Changes of 8/11/08 <br />$1,801.00 <br />6 <br />026 <br />R1 <br />Soffits for Duct Issues <br />$1,159.00 <br />6 <br />027 <br />R1 <br />Bulkheads @ 106,173,193 & 194 <br />$1,974.00 <br />6 <br />029 <br />RI <br />16' Ranged Coupling Adaptor <br />$1,802.00 <br />6 <br />030 <br />Delete Trap Primers <br />($8,655.00", <br />6 <br />032 <br />Recessed Valve Cabinets <br />($7,033.00) <br />6 <br />034 <br />R1 <br />Room 148 Trench to FD-2 <br />$337.00 <br />6 <br />036 <br />Credit VE Plumbing Fixtures <br />($679.00) <br />6 <br />040 <br />Change CO-6 Frame/Add CMU <br />$1,703.00 <br />6 <br />045 <br />RI <br />Add Knox Box <br />$382.00 <br />6 <br />046 <br />Relocate Commercial Dryer <br />$1,206.00 <br />6 <br />052 <br />Add Siemens as Preferred Sub <br />$5,024.00 <br />6 <br />058 <br />Add P-Plam Pass Thdugh <br />$4,067.00 <br />6 <br />059 <br />Surgery Area Base Cabinets <br />$11,304.00 <br />6 <br />060 <br />Change all Asphalt to HD <br />$1,809.60 <br />7R2 <br />021 <br />R3 <br />Adjustment to 21 R2 <br />($5.212.100"! <br />7112 <br />014 <br />R2 <br />Credit for lobby Revisions <br />($11818,001 <br />7112 <br />023 <br />Change 149 and 171 ceilings <br />$583.00 <br />7142 <br />033 <br />RI <br />Well Water Testing <br />$1,048.00 <br />7142 <br />038 <br />R2 <br />Street Sign Reconciliation <br />1$6,547.003 <br />7112 <br />041 <br />Add Rear Gravel Walkway <br />$477.00 <br />7112 <br />044 <br />RI <br />lAdd <br />Oxygen/Surgery Changes <br />($768.00? <br />7112 <br />048 <br />R1 <br />Cat Cage Grates <br />$11,217.00 <br />i <br />N <br />