Browse
Search
ORD-2010-082 Animal Services Facility Third Amendment to Agree Construction Manager at Risk & Approval of Budget Amendment # 2-A
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2010
>
ORD-2010-082 Animal Services Facility Third Amendment to Agree Construction Manager at Risk & Approval of Budget Amendment # 2-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2015 2:28:09 PM
Creation date
9/13/2010 9:38:06 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2010
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4p
Document Relationships
Agenda - 09-02-2010 - 4p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 09-02-2010 - Regular Mtg.
Minutes 09-02-2010
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Summary: Orange County Animal Services Facility <br />Clancy & Theys Construction Company <br />Updated: <br />CO # <br />PCO # <br />Revision <br />Description -. <br />14 (9) <br />109 <br />Paint downspout leaders <br />14 (9) <br />114 <br />Credit unused grading <br />14 (9) <br />117 <br />Walk -in freezer credit <br />14 <br />14 (10) <br />084 <br />Plumbing and controls scope not in Quate scope <br />14 (10) <br />090 <br />Rl <br />Re -work RFD covers <br />14 (10) <br />093 <br />Upgrade site lighting <br />14 (10) <br />100 <br />Replace lighting sleeve <br />14 (10) <br />105 <br />Revised floor drains, well pump, etc. <br />14 (10) <br />107 <br />Temporary glass for alarm testing <br />14 (10) <br />112 <br />Repainting and Touchup <br />14 (10) <br />116 <br />Six trench drain covers and sally port <br />14 (10), <br />14 (11R) <br />017 <br />Interior control joints added in CMU <br />14 (11 R) <br />063 <br />Extend Gas to Rogers Road <br />14 (11 R) <br />085 <br />R1 <br />Plumbing revisions' <br />14 (11 R) <br />111 <br />I <br />Post move touchup painting <br />14 (11 R) <br />115 <br />Owner furnished equipment connections <br />14 (11 R) <br />14 (13) <br />23 <br />R1 <br />Change 149 and 171 ceilings <br />14 (13) <br />028 <br />Overhead dock door buttons <br />14 (13) <br />118 <br />Roof curb relocation error by C &T <br />14 (13) <br />119 <br />15% markup on CMU sealant installation <br />14 (13) <br />120 <br />Survey to find dimensional errors on dwgs <br />14 (13) <br />121 <br />Repaint entry ceiling <br />14 (13) <br />122 <br />Error in base contract amount for Aspalt Experts <br />14 (13) <br />123 <br />Stainless steel scope gaps and rework <br />14 (13) <br />124 <br />IRN 89 math error on PCO 5R1 <br />14(13) <br />14 (rec) <br />Close -out adjustment credit <br />Totals: <br />Notes <br />1. Reduced per agreement with CMAR <br />8/6/2010 <br />;ost <br />$639.00 <br />($ t 8.036.00 <br />?6,638.00`- <br />$14,263.00 <br />$1,658.00 <br />$940.00 <br />$1,757.00 <br />$2,412.00 <br />$1,542.00 <br />$3,668.00 <br />$1,126.00 <br />)7;366,00? <br />$454.00 <br />$16,747.00 <br />$41,608.00 <br />$3,316.00 <br />$301.00 <br />$441.00 <br />$874.00 <br />$668.00 <br />$2,188.00 <br />$151.00 <br />$1,296.00 <br />$2,368.00 <br />$2,141.00 <br />$10,428.00' <br />132,239.00} <br />$3;193.00 <br />$731,059 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.