Orange County NC Website
10 <br />Change Order Summary: Orange County Animal Services Facility <br />Clancy & Theys Construction Company <br />Updated: 8/6/2010 <br />CO # <br />PCO # ` <br />'Revision <br />Description <br />Cost <br />7112 <br />049 <br />Add Wave Dock Bumpers <br />$1,259.00 <br />7R2 <br />054 <br />Temporary Structure Silt pond <br />$1,005.00 <br />7112 <br />056 <br />Add Junction Box per DOT <br />$3,597.00 <br />7R2 <br />065 <br />Increase Door from 3' -0" to 3' -8" <br />$108.00 <br />7112 <br />067 <br />Delete Metal Shelves <br />($21512.00) <br />7112 <br />070 <br />Add 4" Fiber Sleeve Under Roadway <br />$308.00 <br />7R2 <br />073 <br />Add Pressure Treated Wood Bases <br />$613.00 <br />7R2 <br />075 <br />Delete Vortex Protectors <br />($1,142.00; <br />7112 <br />077 <br />Add dryer fire line <br />$2,027.00 <br />7R2 <br />079 <br />Flashing Around Freezer <br />$676.00 <br />7R2 <br />082 <br />Undercut unsuitable soil <br />$3,535.00 <br />7R2 <br />088 <br />Revised landscape planting <br />$301.00 <br />7R2 <br />091 <br />Add wheelstops at freezer <br />$201.00 <br />7112 <br />094 <br />Add boiler cut off switches <br />$867.00 <br />7R2 <br />095 <br />Tie door controls to fire alarm <br />$266.00 <br />7R2 <br />098 <br />Change CRS to CRC fixtures <br />$498.00 <br />7R2 <br />099 <br />Change lighting in versatile hold <br />$445.00 <br />7112 <br />101 <br />Reface cat condos <br />$2,542.00 <br />7R2 <br />102 <br />Add sidewalks/ramps <br />$8,830.00 <br />7132 <br />103 <br />Assemble Cat Condos <br />$492.00 <br />7R2 <br />104 <br />Install freezer <br />$466.00 <br />7R2 <br />s , <br />8R3 <br />031 <br />Foundation Drain Trunk Lines <br />$5,185.00 <br />8R3 <br />035 <br />R1 <br />Add Downspout Nozzles, etc. <br />$2,680.00 <br />8113 <br />064 <br />RI <br />Extend Gas to Rogers Road <br />$25,120.00 <br />8R3 <br />074 <br />Install Plywood Ceiling to plan <br />$405.00 <br />8R3 <br />081 <br />Modify Lobby Trellis <br />$4,194.00 <br />8113 <br />087 <br />Wire card reader strikes <br />$1,560.00 <br />SR3' ;. <br />14 (9) <br />008 <br />R2 <br />Revised FRFD risers and grates <br />$5,479.00 <br />14 (9) <br />025 <br />R3 <br />Roof Drain Leader <br />$1,897.00 <br />14 (9) <br />042 <br />R3 <br />Washer /Dryer hookups, chases, cut floor <br />$14,599.00 <br />14 (9) <br />050 <br />Add soffits at CO-1 <br />$751.00 <br />14 (9) <br />053 <br />Re- mobilization of grading sub <br />$603.00 <br />14 (9) <br />055 <br />RI <br />Double handle dirt removal <br />$11,345.00 <br />14 (9) <br />062 <br />Seal exterior of CMU <br />$4,943.00 <br />14 (9) <br />066 <br />Revise soffit at diagonal brace <br />$1,228.00 <br />14 (9) <br />068 <br />R1 <br />Furr shower walls for tile install <br />$350.00 <br />14 (9) <br />069 <br />R1 <br />Stacked W/D & X -ray power (120V) <br />$1,401.00 <br />14 (9) <br />071 <br />Revise wiring of unit heaters <br />$281.00 <br />14 (9) <br />072 <br />Revise wiring of overhead doors <br />$1,067.00 <br />14 (9) <br />78 <br />R1 <br />Misc. Concrete Adjustments <br />$6,221.00 <br />14 (9) <br />080 <br />R1 <br />Flush and clean new sanitary sewer <br />$538.00 <br />14 (9) <br />089 <br />Delete EIFS <br />($301.00" <br />14 (9) 1 <br />092 1 <br />1 <br />Install 3 dryer receptacles 1 <br />$2,021.00 <br />14 (9) <br />106 <br />Credit for Owner Installed equipment 1 <br />$3.465.00? <br />