Browse
Search
Agenda - 09-16-2010 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 09-16-2010 - AOG
>
Agenda - 09-16-2010 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2015 3:24:44 PM
Creation date
9/10/2010 4:38:00 PM
Metadata
Fields
Template:
BOCC
Date
9/16/2010
Meeting Type
Municipalities
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 09-16-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft <br /> PLANNING ELEMENTS <br /> NC LOCAL GOVERNMENT 10 YEAR SOLID WASTE MANAGEMENT PLAN <br /> PLANNING YEARS 2008 through 2018 <br /> Check appropriate element ' <br /> Reduction Disaster Response Illegal Disposal/Litter ✓Disposal Collection <br /> Transfer outside geographic Education with community& Collection of Computer Equipment and Purchasing Recycled Special Waste ' <br /> area through school Televisions Products <br /> Composting and Mulching Incineration with/without energy Management of Abandoned Manufactured Recycling and Reuse <br /> recovery Homes <br /> COMPLETED ACTIONS INCOMPLETE ACTIONS NEW/REVISED ACTIONS <br /> KEY ACTIONS KEY ACTIONS WHY INCOMI'LETE? KEY ACTIONS DATE DUE ESTIMATED TONS <br /> DIVERTED IN lOTH YEAR <br /> County operates MSW and Develop and finance No final long-term Hire engineering firm to June 2010 50,000-60,000 tons to be I <br /> C&D landfills for waste closure and long term closure plan has yet develop closure plan. landfilled elsewhere that were � <br /> disposal.MSW due to close care plan for current been developed or Develop plan.Subinit 2010-11 formerly buried in Orange <br /> early 2013. MSW landfill. funding estimate for approval County. <br /> completed.Engineering Conduct closure of Spring 2013 <br /> firm hired in June 2010 MSW landfill <br /> to develop closure plan. <br /> No alternative disposal site Choose alternative No decision taken yet Determine if all FY 2010-11 <br /> MSW transfer& by any elected board in governments <br /> disposal sites when any jurisdictions now partner/coordinate <br /> landfill closes. using the Orange delivery of MSW <br /> County Landfill. Develop agreement for <br /> Active C&D landfill transfer and disposal as <br /> estimated to have 18 year life necessary <br /> (2028)at current rate of use <br /> (<8,000 tpy) <br /> Closed C&D landfill may be Develop RFP In progress Fa112010- <br /> used for solar array in 2010- <br /> 11. Accept proposals for <br /> solar installation and 2011 <br /> award contract <br /> Closed MSW landfill will be LJNC to complete bid In progress Construct solar array if Fall/winter 2010 <br /> used for methane as ca ture rocess and award bid acce tabie ro osal <br /> 80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.