Browse
Search
ORD-2010-083 Justice Facility - Contractor Extended Overhead Request & Approval of Budget Amendment #2
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2010
>
ORD-2010-083 Justice Facility - Contractor Extended Overhead Request & Approval of Budget Amendment #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2015 2:29:18 PM
Creation date
9/8/2010 12:18:22 PM
Metadata
Fields
Template:
BOCC
Date
9/2/2010
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4q
Document Relationships
Agenda - 09-02-2010 - 4q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 09-02-2010 - Regular Mtg.
Minutes 09-02-2010
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />• •&o'tYSte+u•etion•• Company, lne. ~ + <br />23. January 4a', 2010-April 28~': CodQ Revision w.d associated finish work <br />ongoing until date of substantial. completion Apri128a', 2010. <br />• Associated Cost per above time line: <br />• _ n June'' 17~; 20U~ August 316 ; 2Q09: On Jung 11~', BCC zeeeived stop work <br />directive •ozi~ all work associated with FM#56, at this'time BCC was <br />. working on oxg. contract work to the extent possible. Work was limited. to <br />..+ • ~ - selective demolition in areas throughout the building only. •Sub-contractor <br />work was•halted at this poilrt until resolution. could be made to move <br />forward with code revisions. On July 1~, X009 BCC'demobilized•fromtha <br />pxojeCt site. .. . <br />. General~Conditions (a3 $324.00/day (x} 61 days = $19,724.00 <br />. • Supervision & Ilxsuranees @ $446.001day (x) 61 days= *$CC <br />allocated supervision and labor forces during this period on various <br />. othergroject sites throughout the company as to not layoff any of our <br />staff sllocatecl for this project **Upon acceptmrsce of this proposal <br />BCC wi11 not seek any fiirther labor or supervision cost incuxxed for <br />this time period. <br />• Sub-Total during this period: $19,724.OA <br />_ I~ August 31~; 2009 November 20~; 2009: During this period Bce <br />maintained an ansite presence of one superintendent and 2 laborers, <br />working on CP-12, site wall~way revisions and misc interior up fits <br />associate with~OCBI code ilr~pxovements; subeoxctractorworkwus minimal <br />to non-extent during Ibis geriod oftime as BCC was working under <br />premise tjlat ongoing code review pricitlg would.,be.approved. Cost is <br />r0ftective-of BCC workilig at M4~45Y effieieflcy, • <br />• General Conditions @ $324.OOtday (~c} 81 days =$26,244.00 <br />« Supervision &-Insurances @ $446.00/day (x) 81 days = $36,126.00 <br />. . • dub-Total during this period: $62,370.00 (-)BCC ongoing work @ <br />45% efficiency = $28,Q67.00 <br />• Total forthisperiod =$34,303.00 . <br />II~ November 20a; 2009-December 28a', 2009: OnNavember 18~", Z009, BCC . <br />-received letter from CRZ {Change Order G 13 Status) stating the intezit.bf <br />the owner to execute Change Order G-13 and tfLat said change order wot~Id <br />be executed no later than December 1.5, 2009 by OCBC. In this letter the <br />• owner also "request that you stop work on the project on any items which <br />. will negatively affect or impact the future work of the code <br />' PO Box 2935, Durham, NC 27715-2435 IDO E. Brltania Ave., Du'rflant, NC 27704 <br />(919) 220-1141 tel {919) 220-1147 fax ' <br />tnvt~v.6ordeaua~consCructionrn.mm <br />
The URL can be used to link to this page
Your browser does not support the video tag.