<br />~ ~ ~ ~ ~ A U X <br />Conslruct[on Company, Inc. <br />8. September 280; 2009: OC cannot move_forward with sprinkler approval at this <br />time as ap~roval~ from board is required . <br />9. October S , 2009: BCC provides proposal to CRZ for cost of sprinkler shop <br />drawing only. To date NO approval has been given with regards to any items <br />associated with Field Memo #S6. <br />IO.October 140; 2009: CRZ notifies BCC that OCBI has reviewed and approved <br />associated drawing revisions {FM#S6 Code Improvements); BCC to prepare <br />revised priding. <br />11.October 160i, 2009: CRZ upon approval of OC releases BCC to begin <br />preparations of sprinkler shop drawings. <br />12.October 30~ ; 2009: BCC provides FM#56 "Code Revisions" revised pricing to <br />CRZ for owner appxval . . <br />13. Novembe>a2"~, 2009: BCC, CRZ and OC meet to discuss change proposal. At <br />this time OC feels as cost are still prohibitive and request BCC to revise <br />pricing again and remove items chat will be performed by the owner. Also <br />addressed at this meeting; Tom Bordeaux (BCC) and Jeff Thompson (OC) <br />discussed the additional lost ineuned by BCC during this process of code <br />revision pricing and Mr. Thompsoni ac~owledged that Bordeaux had incurred <br />additionai cost but requested that BCC separate the extended cost from this CP ; <br />Mr. Bordeaux agreed to do us and both parties agreed to access this'cost upon <br />completion of the contract. <br />14. November Sa; 2009: BCC provide additional revisions requested by OC for <br />approval {CF#S7R2). <br />15. November 140; 2009: BCC stops drywall subcontractor from concealing all <br />walls and ceilings as No• further work can be done (BB or CO} at this time <br />pending owner approval on code revisions. <br />16. November 1601, 2009: CRZ notifies BCC that code improvements in the <br />existing building cannot be approved by theowner at th}s ~timeg.owner will <br />have to go before BOC for approval <br />17. November 1801, 2009: BCC given stop work notice on code revisions by OC <br />and requested to revise CP#S7R to reflect additional cost as stated in CRZ <br />letter "11/18/Q9 Change Order G-13 Status": <br />18. November 200', 2009: BCC demobilizes from project for a second time. <br />19. November 300; 2009: BCC provides CRZ with CP#S7R3 for approval and <br />execution. <br />20. December 4a ; 2009: BCC receives cover letter for CP-I3 for signature. <br />--~- ~~- - ~--..,-.~---~-.,---..,.-...~._.. _~~. 0,..ti .,r .. ~._-.--,,.-..,,.-.,.._,.-..-~_....~-.~ -,...,..,.~ <br />21. Dece"-'giber 2~$ , 2~3: ~CZ; receives ndtsce o~ egec e CP=13 y owner {SCC-~- ~~~--~ <br />. ~ signed 12/7/CRZ signed 12/10 & OC signed 12/18) ' <br />22. J:anllary 4~', 2010: BCC and associated subcontractors remobilize to site to <br />complete associated. code revision CO and building completion. <br />Pd Box 2935, Durham, NC 277!5-2935 I00 E. Brita~ria Ave., IIurfiam, NC 27704 ~„ <br />(919) 220-1141 teI (9I9) 22D-1147 tax <br />wu~tvbordeauxcanstrncdonrncom <br />