Browse
Search
2006 NS Contract - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2006
>
2006 NS Contract - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2011 11:37:32 AM
Creation date
9/2/2010 9:49:29 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />Name: Mr. And Mrs. Grasty Page 6 of 15 <br />Address: 119 Hayes Street <br />-City: Hiils6orough <br />Phone #: 732-3608 <br />Date: <br /> <br />D. PLUMBING <br />Remove existing galvanized plumbing vent and drain line from exterior <br />rear wall to bottom of Kitchen sink and extending under house to main <br />drain hub under house. Remove existing galvaxuzed/cast iron drain line <br />from main drain hub to underground connection at front of crawlspace. <br />Supply and install new plastic drain line to relocate Kitchen drain to inside <br />of sink base cabinet, including a "Studer" vent. Includes supply and <br />install new drain line to new washing machine box in laundry closet. <br />Other new drain lines to be at same locations, including proper tie-in to <br />existing remaining line, complete. Restore vent and drain lines to proper <br />working order. Work shall be performed in an efficient, workmanlike <br />manner so as to keep "down time" and temporary connections to a <br />minimum. All work to code. <br /> <br />2. Supply and install insulating material to existing accessible water supply <br />lines in crawlspace, complete.. <br />3. Disconnect existing laundry hot and cold water supply lines in sub-area <br />immediately under laundry closet. Supply and install new washing <br />machine box in wall immediately behind washing machine. Make proper <br />connection to existing water lines in sub-area and supply and install new <br />hot and cold water supply lines inside of existing wall behind washing <br />machine and connect to new washing machine box, complete. All work to <br />code. <br />E. ELECTRICAL <br />Properly disconnect and abandon existing electrical service. Supply and <br />install new 200 AMP electrical service to house including new breaker <br />panel, mast, weatherhead, grounding and bonding, complete. Work shall <br />be performed. in an efficient, workmanlike manner so as to keep "down <br />time" and temporary connections to a minimum. Includes locating <br />electrical meter a minimum of 31.f. away from existing gas meter and as <br />close as practical to existing location. Includes new circuits; breakers, <br />grounding and bonding, complete. Breaker panel to be at existing location <br />with circuits and breakers to be clearly identified. Newly installed <br />
The URL can be used to link to this page
Your browser does not support the video tag.